| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr Quoted ₹1.9 Cr | L1 | Accepted-AOC 90th Tender Awarded Committee held on 03.09.2024 |
| 2 | L2₹1.9 Cr+₹45,488.18 (0.24%)Rejected-Finance | ₹1.9 Cr+₹45,488.18 (0.24%) | L2 | Rejected-Finance Highest rate quoted |
Tender Value
₹1.7 Cr
EMD Value
₹97,500
Closing Date
26 Dec 2023, 5:00 pmClosed
Executive officer,Vishwanathaswamy Temple
Arulmigu Vishwanathaswamy Temple at Karuppur Thiruvarur Taluk,Thiruvarur District
Re Construction of All Sannathi, Cutstone Mandapam and Madhilwall for Arulmigu Vishwanathaswamy Temple at Karuppur Thiruvarur Taluk,Thiruvarur District
2023_HRCE_398575_1
03 - L-kar - 2023
Open Tender
Civil Works - Others
Lump-sum
550 days
Arulmigu Vishwanathaswamy Temple at Karuppur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹97,500
Yes
3 Oct 2024
12 Dec 2023
27 Dec 2023
12 Dec 2023
26 Dec 2023
12 Dec 2023
12 Dec 2023 - 26 Dec 2023
Amount
Laying and Jointing PVC Pipe. Heading
Brick work in C.M 1:5 mix including all labour charges etc complete
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling with sand gravel mix including cost and conveyance of sand, gravel and all labour charges for filling ramming etc. complet with standard specifications.
Supplying and filling in foundation in basement with filling sand in layars of 150mm thickness well watered rammed and consolidated complyiny with relevant std specification including cost of supplying filling sand.
Cement concrete 1:5:10 (One of cement five of sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete in respects complying with relevant Std, Specification and as directed by the Dept, Officers.
Providing and laying position,Standardised concrete mi M-20 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 3250 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors,finishing,curing,etc,complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the ecess usage of materials.)
A) Up to Basement
B)For super structure
Centering for soffits of Rcc slabs of plain surface like lintels, beams, etc., including strutting 3M high using MS sheets of size 90cmx60cm and PG 10 stiffened with MS angles of size 25x25x3mm laid over silver oak (C.W) joists of size 10x6.5cm (spaced at about 90cm c/c) and supports 75cm c/c complying with standard specification and directed 10sqm.
A) Centering up to grade beam
B)Centering for column
Supplying fabrication and placing in possition of MS or RTS bars for all RCC works including cutting bending placing and the cost of binding wire etc., complete.
Plastering with Lime Mortor1:5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works..
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications.
Best varnish two coats for wood works etc, complete complying with standard specifications.
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Cement Mortar 1:5 & Combination Mortor1:1:5 etc complete.
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in Combination Mortor1:1:3,12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.The lime used should be sourced which is highly iron fortified and suitable for structural and masonry works.
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification
Labour charges for cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Nilaikkal (Nagapantham Kodikarukku and Flower) excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Valaipoo Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Labour charges for cut stone Thani Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Labour charges for cut stone Thani Uthiram excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Labour charges for cut stone Asvapatham Sthampam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Labour charges for cut Stone Pillar excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Labour charges for cut stone Chithiravanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone padma jegathi athisdanam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kumatham excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Pattiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Viyala vari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kandam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kandam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Sthampam kalasam thadi excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kudam palagai excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Veerakandam Bothiyal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Uthiram Kampu Eluthagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kabothagam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Ullvari excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using old stones
Using New stones
Labour charges for cut stone Kabothaga Koodu excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
Using New stones
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non- Flammable shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
Up to 15' 0" ht
Brick work in Lime Mortor1:2 using Country bricks size 8 -3/4"x4 1/4"x2 1/4" III-class including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
Brick masonry Lime mortor 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
A)Kalkaram
A)Vimanam
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortor 1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortor 1:4 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
A)Kalkaram
B)Vimanam up to 15'0" Excluding kalkaram
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
B)Vimanam up to 15'0" Excluding kalkaram
Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification.
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM1:3 finishing the same with LM1:3 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
A)Sudhai size above 1'0" up to 2'6"
B)Sudhai size above 2'6" up to 3'6"
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications.
Add GST 18%
T.GANESAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_474604.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .