| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.2 LAdmitted-Finance | +0.00% | ₹18.2 L | L1 | Admitted-Finance |
| 2 | L2₹18.7 LAdmitted-Finance | +2.25% | ₹18.7 L | L2 | Admitted-Finance |
| 3 | L3₹18.8 LAdmitted-Finance | +3.00% | ₹18.8 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹18.2 L
EMD Value
₹18,240
Closing Date
30 Mar 2026, 3:00 pmClosed
EE RWS ZP AHILYANAGAR
EE RWS ZP AHILYANAGAR
Arrangement for water supply system for toilet and bathrooms at DPRC Akolner Tal and Dist Ahilyanagar
2026_AHMED_1289411_1
ZP/RWS/TENDER/2025-26
Open Tender
Civil Works
180 days
AHILYANAGAR
AS PER NIT
2 documents required · 2 mandatory
₹1,180
₹18,240
Yes
22 Apr 2026
23 Mar 2026
1 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Sub Estimate A: water supply Arrangement
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A1/259) | - | Cum | - | - | |
Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. | - | Cum | - | - | |
Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. | - | Cum | - | - | |
Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. | - | Cum | - | - | |
Providing , laying and fixing ,jointing Eco- drain 200 mm SN 4 Nu- Drain Upvc pipes or of equivalent make, manufacture as per EN 13476 or equivalent as per I.S.15328 with fittings such a bends, tees tees, coupler etc, jointing with rubber lubricant including necessary excavation, trench refilling with selective excavated materialetc. complete. | - | Rmt. | - | - | |
Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) | - | Cum. | - | - | |
Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. | - | Cum. | - | - | |
Providing and fixing H.D.P container one piece moulded water tank made out of high density polythyler and built corrugated inclusive of delivery up to destination hoisting and fixing of accessories such as inlet,outlet overflow pipe inclusive of all tanks capacity between 200 to 1000 liters | - | Lit | - | - | |
Providing, laying and fixingP.V.C. pipe of 25mm dia. with fittings such as bends, tees, reducers, clamps,etc. including necessary excavation, trench filling etc. complete. Includingremoving existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete. | - | Rmt. | - | - | |
Sub Estimate B :Toilets and Reparing Work
Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering,preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) | - | as | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_2216834.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid