| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹21.6 L+₹46,612.25 (2.20%)Rejected-AOC 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | M S ENGINEERS L2 | ABBI ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all soils and sub-soils and the full depth as may be directed by the departmental officers with initial lead and lift and cleaning and levelling the site etc., complete complying with standard specification | 461 | m3 | 140 ₹64,540 | 135.16 ₹62,308.76 Lowest |
| 2.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 63 | m3 | 6,000 ₹3,78,000 | 5,589.83 ₹3,52,159.29 Lowest |
| 3.00Centering with Steel Plates for Sides and Soffits including all Labour Charges as per the Direction of the Departmental officers Etc., Complete. | |||||
| 3.01 | Centering without strutting-for drain | 992 | m2 | 500 ₹4,96,000 | 488.75 ₹4,84,840 Lowest |
| 3.02 | Centering for soffits of RC slab including strutting | 15 | m2 | 1,300 ₹19,500 | 1,289.38 ₹19,340.7 Lowest |
| 4.00 | Plain cement concrete 1:3:6 mix (One cement three M.Sand and six aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification | 164 | m3 | 6,350 ₹10,41,368.25 | 6,319.07 ₹10,36,295.88 Lowest |
| 5.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications | 3 | Qtl | 9,350 ₹28,034.82 | 9,321.1 ₹27,948.16 Lowest |
| 6.00 | Providing and laying in position of ready mix concrete 1:1.5:3 mix using Portland cementwith water cement ratio not exceeding 0.45 including the use of plastidizer of approvedmake and dosage required grade at all location and levels using 20mm ISS gauge HBBG metal and down graded aggregates in all type of works including hire charges for pump andpumping charges to required location. machine, vibrating, tapping, curing as specifiedcharges conveyance for ready mixed concrete from RMC plant to site or required ( excluding cost of reinforcement, fabrication charges centering and shuttering ) mix bydepartmental officers etc complete as per IS 4926 of 1976/1990 | 4 | m2 | 7,600 ₹30,382.37 | 7,592.93 ₹30,354.1 Lowest |
| 7.00 | Plastering in Cement Morter 1: 5 Mix using 12 mm Thick including Curing and all Labour Charges as per the Direction of the Departmental officers Etc., Complete | 204 | m2 | 300 ₹61,200 | 291.84 ₹59,535.36 Lowest |
| 8.00 | Conveyance of excavated earth from site 0 to 15 km lead including loading and unloading elements completed | 277 | m3 | 68 ₹18,836 | 67.3 ₹18,642.1 Lowest |
Tender Value
₹25.7 L
EMD Value
₹25,700
Closing Date
17 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Storm water Drain and Culvert at Brindavan Circle (from Swarnapuri Jn to Kurinji Nagar SWD) in Ward No.87,south Zone
2025_MAWS_578304_21
e36/2025 -Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹25,700
1 Nov 2025
5 Jul 2025
18 Jul 2025
5 Jul 2025
17 Jul 2025
5 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .