Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance G T ROAD NIRSHA MUGMA 828205 JHARKHAND INDIA | MUGMA | DHANBAD | JHARKHAND | 828205 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NIRSHA DHANBAD 828205 JHARKHAND INDIA | NIRSHA | DHANBAD | JHARKHAND | 828205 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance VILL GHURITAL PO WAIDHAN DISTT SINGRAULI MP PIN 486886 | WAIDHAN | SINGRAULI | MADHYA PRADESH | 486886 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.3 L
EMD Value
₹4,100
Closing Date
19 Oct 2024, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer E and M
office of the general manager S.P Mines Area
Repairing or rewinding of 700 KVA, 3.3 KV/440V Andrew Yule make Transformer installed at Old Colony of Chitra Colliery under SP Mines Area
2024_ECL_319001_1
ECL/SPM/GM/EandM/24-25/42
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
CHITRA COLLIERY SP MINES AREA
please refer nit documents
4 documents required · 4 mandatory
₹4,100
Yes
21 Oct 2024
9 Oct 2024
21 Oct 2024
9 Oct 2024
19 Oct 2024
9 Oct 2024
9 Oct 2024 - 13 Oct 2024
Amount
Item Description/ Heading
Supply of copper conductor for damaged winding(less cost of scrap value)
insulation of conductor for primary coils (new copper strip 80 kg) & secondary coil (existing old copper strip 330 kg) by TPC
De-hydration & filtration of Transformer Oil to improve Di-electric strength
Cost of brazing with supply of rupaton rod, oxygen, DA, for brazing of all the primary & secondary connections
Cost of insulating materials varnishing pre-compress paper board oil duct cotton tape webbing tape etc.
supply of studs & bussing
supply of cork sheet 10 mm size
All joints cleaning
Transportation charges (02 side)
Painting the outter body of the transformer by one coat of primer and two cost of metallic paints including supply of missing nuts & bolts etc & tank welding & repairing
Lobour costfor formations of winding coil brazing fitting of insulating materials paper board oil duct cotton tape studa & bushing cork sheet etc.
Over head cost@10%
CMPF & CMPS (19%) on labour cost
Total impact of GST for the purpose of CTC
M/S INDRA ELECTRICAL EQUIPMENT
SANTOSH CONSTRUCTION
finance_330653.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .