Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.8 LAccepted-AOC 17TH FLOOR UNIT NO 1 TOWER 1 PS SRIJAN CORPORATE TECH PARK PLOT NO 2 BLOCK EP GP SECTOR V SALT LAKE KOLKATA WEST BENGAL 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | L1 | Accepted-AOC L1 | |
| 2 | L2₹54.1 L+₹6,000 (0.11%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
Closing Date
10 Jul 2021, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CM P
Thal
AJ-69559 supply of UPS
2021_RCFL_629648_1
AJ-69559 supply of UPS
Open Tender
UPS
Supply
180 days
Thal
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
Exempted
28 Oct 2021
11 May 2021
10 Jul 2021
11 May 2021
10 Jul 2021
11 May 2021
90 days
SUPPLY OF ITEMS AS PER FOLLOWING SPECIFICATIONS
UPS with 25 KVA net output along with base frame as per specs.
UPS with 40 KVA net output along with base frame as per specs.
Supply of Battery Bank ( NiCd type) including Installation , Testing & Commissioning at site.
Spares (Attach separate list with quantity & unit rate) ref. point -8.0
Main Distribution Board as per SLD and specifications with super static switches.
Testing Charges for Complete system including UPS’s, Bypass UPS (SCVS), transformers, switching cubicles, Static switch, Main Distribution Boards, battery banks etc. (FOR SEPARATE WORK ORDER)
Supervision Charges for Installation & Commissioning of complete system including UPS, transformers, switching cubicles, Main Distribution Boards, battery bank etc.(10days) (FOR SEPARATE WORK ORDER)
Comprehensive AMC charges after warrantee period AMC for 1st year per VFD (FOR SEPARATE WORK ORDER)
Comprehensive AMC charges after warrantee period AMC for 2nd year per VFD (FOR SEPARATE WORK ORDER)
Comprehensive AMC charges after warrantee period AMC for 3rd year per VFD (FOR SEPARATE WORK ORDER)
Buyback offer for the old removed IL make parallel redundant 25KVA UPS (02 nos.) with SVS and without battery banks and ACDB
Hitaci Hi-Rel Power Electronics Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .