Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Fee/PreQual/Technical/Finance | -20.02% | ₹11.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.7 L+₹28,769.86 (2.53%)Admitted-Fee/PreQual/Technical/Finance | -18.00% | ₹11.7 L+₹28,769.86 (2.53%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.1 L+₹71,639.80 (6.29%)Admitted-Fee/PreQual/Technical/Finance AT SATABHAUNI CHHAK KORKORA PO BHADRAK RURAL PS BHADRAK DIST BHADRAK PIN 756116 | BHADRAK | BHADRAK | ODISHA | 756116 | -14.99% | ₹12.1 L+₹71,639.80 (6.29%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹14.2 L
EMD Value
₹14,300
Closing Date
11 Sept 2026, 5:00 pmClosed
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL BBSR
Construction of Gents Toilet ,Ladies Toilet and Rest room at 220 132 33 KV grid SS at Balasore
2026_OPTCL_139613_1
OPTCL-CVL-SE - E-05 - 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
BALASORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹14,300
Yes
21 Sept 2026
29 Aug 2026
21 Sept 2026
29 Aug 2026
11 Sept 2026
29 Aug 2026
29 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying all labour for dismantling GCI sheet including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 1 | Sqm | - | - |
| 2 | Supplying all labour for dismantling cement concrete including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 1 | cum | 1 | ₹1 |
| 3 | Supplying all labour and T&P for dismantling and removing RCC column & Beam including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance, royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | - | Cum | 1 | - |
| 4 | Supplying all labour for dismantling brick masonry including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 1 | cum | 1 | ₹1 |
| 5 | Supplying all labour for removal of cement plaster including racking out joints 12 mm deep and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | - | Sqm | - | - |
| 6 | Supplying all labour T&P and materials and providing Single under reamed pile foundation with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S/Tor steel and labour charges for cutting, bending and binding of steel in sandy medium black cotton soil (submerged, normal, dry) up to 300mm dia, 6.0 mtr. Depth or as required at site below the ground level using cement concrete 1:1 1/2:3) - M20 using 1/2" to 3/4" size hard black crusher broken granite chips or approved quality from approved quarry using M.S. Rod/Tor steel as reinforcing materials as required as per the drawing and design etc. including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete but excluding cost of M.S. Rod/Tor Steel and labour charges for cutting, bending, binding of reinforecement materials etc complete in all respects as per direction of the Engineer in charge. | - | Each | 1 | - |
| 7 | Earthwork in excavation in ordinary soil on foundation trenches including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | - | cum | - | - |
| 8 | Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | - | cum | - | - |
| 9 | Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | 1 | cum | 1 | ₹1 |
| 10 | Cement concrete with M20 in using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality from approved quarry including lower laying concrete watering and curing etc complete including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.79 MB
Tendernotice_2.pdf
PDF • 1.46 MB
Tendernotice_3.pdf
PDF • 4.50 MB
Tendernotice_4.pdf
PDF • 1.15 MB
Tendernotice_5.pdf
PDF • 1.31 MB
BOQ_607263.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .