Loading…
Loading…
Tender Value
₹70,000
Closing Date
31 Aug 2026, 3:00 pm7d left
Block Development Officer (BP), Nallampalli
Block Development Officer (BP), Nallampalli
Repairs to the Kitched Shed at PUM School Campus in Keel Esalpatti H/o. Maniyathahalli - Package No.TN04-P01- General Fund (Block Panchayat) 2026-27 - Nallampalli Block - P01
2026_RDTN_694513_1
Roc.No. 1561/2026/A2 Dt. 14.08.2026 P01
Open Tender
Civil Works
Item Rate
Block Development Office, Nallampalli
Can be seen in the Tender Documents
2 documents required · 2 mandatory
₹0
Block Development Office, Nallampalli
14 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to the Kitched Shed at PUM School Campus in Keel Esalpatti H/o. Maniyathahalli | - | - | - | - |
| 2 | Chipping the cement plastered surface and roughnening the surface | 1 | Sqm | - | - |
| 3 | Pointing with cement mortar 1:3 to full depth of tiles using crudeoil 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete | 1 | Sqm | - | - |
| 4 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 1 | Sqm | - | - |
| 5 | Distempering two coats using best distemper in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. | - | Sqm | - | - |
| 6 | Painting two coats with approved Exterior Emulsion with priming one coat including cost and conveyance of all materials to site and all labour charges etc complete . | 1 | Sqm | - | - |
| 7 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | - | Sqm | - | - |
| 8 | Provision for Electrification Work | - | - | - | - |
| 9 | Light & Fan Point SD. No. 20 | - | Nos | - | - |
| 10 | Fixing of LED Light SD.88 | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.05 MB
TechnicalBid.pdf
Tender Documents • 0.44 MB
Pricebid_GF.pdf
Tender Documents • 0.29 MB
BOQ_834969.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].