| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.5 LAccepted-Finance SIMBAL CAMP WARD NO 5 NEAR GURUDWARA SAHIB R S PURA DISTT JAMMU J K 1812104 | R S PURA | JAMMU | J K | 1812104 | L-1 | Accepted-Finance Being lowest bidder | |
| 2 | L-2₹16.8 L+₹31,215.94 (1.89%)Rejected-Finance | L-2 | Rejected-Finance Other than lowest bidder | |
| 3 | L-3₹17.6 L+₹1.1 L (6.66%)Rejected-Finance | L-3 | Rejected-Finance Other than lowest bidder | |
| 4 | L-4₹17.8 L+₹1.3 L (7.88%)Rejected-Finance | L-4 | Rejected-Finance Other than lowest bidder | |
| 5 | L-5₹20.2 L+₹3.7 L (22.5%)Rejected-Finance 201 GANAPATI SANKUL AGASHIVNAGAR MALKAPUR KARAD SATARA MAHARASHTRA 415539 | SATARA | MAHARASHTRA | 415539 | L-5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | M/S JIWAN SINGH L8 | M/S ESS ESS ENTERPRISES L2 | DARVESH ENGINEERING WORKS L3 | M/S SHREE KRISHANA ENERPRISES L10 | HARSH ELECTRICAL STORE L9 | M/s Sahib Construction and engineers L1 | Prakash Trading Corporation L5 | M/S DC CONSTRUCTIONS L4 | M/S SALARIA ASSOCIATES L6 | BMMJ ENGINEERS AND TRADERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr deep any type of soil getting out and levelling of bottom surface to required level for poles/ stay assembly/ cable complete all as specified and as directed. | 266.5 | Cubic Metre | 90 ₹23,985 | 50 ₹13,325 Lowest | 100 ₹26,650 | 300 ₹79,950 | 300 ₹79,950 | 100 ₹26,650 | 90 ₹23,985 | 100 ₹26,650 | 80 ₹21,320 | 150 ₹39,975 |
| 2.00 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25m thick complete all as specified and as directed. | 226.53 | Cubic Metre | 10 ₹2,265.3 | 19 ₹4,304.07 | 25 ₹5,663.25 | 50 ₹11,326.5 | 100 ₹22,653 | 25 ₹5,663.25 | 3 ₹679.59 Lowest | 100 ₹22,653 | 5 ₹1,132.65 | 40 ₹9,061.2 |
| 3.00 | Removing excavated material from site to a distance not exceeding 50mtr away and depositing where directed not exceeding 1.5mtr from the starting point complete all as specified and as directed. | 39.98 | Cubic Metre | 10 ₹399.8 | 19 ₹759.62 | 25 ₹999.5 | 50 ₹1,999 | 100 ₹3,998 | 25 ₹999.5 | 3 ₹119.94 Lowest | 100 ₹3,998 | 10 ₹399.8 | 40 ₹1,599.2 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and as directed by Engineer-in-Charge. | 30 | Cubic Metre | 2,500 ₹75,000 | 185 ₹5,550 | 500 ₹15,000 | 400 ₹12,000 | 1,500 ₹45,000 | 500 ₹15,000 | 180 ₹5,400 | 100 ₹3,000 Lowest | 100 ₹3,000 Lowest | 1,000 ₹30,000 |
| 5.00 | Supply, laying and fixing DWC HDPE pipe for protection cable (orange in colour) of size 75mm dia complete with fitting and including cutting, jointing and clamping complete all as specified and as directed. | 1,454.6 | Running Metre | 140 ₹2,03,644 | 90 ₹1,30,914 | 80 ₹1,16,368 Lowest | 180 ₹2,61,828 | 200 ₹2,90,920 | 80 ₹1,16,368 Lowest | 100 ₹1,45,460 | 110 ₹1,60,006 | 130 ₹1,89,098 | 175 ₹2,54,555 |
| 6.00 | Taking out old/ unserviceable underground LT cables and connections including pipes, bricks or precast concrete cable cover etc from trenches/ walls/ poles of any cross sectional area and removing from site complete all as specified and as directed. | 2,078 | Running Metre | 5 ₹10,390 | 3 ₹6,234 Lowest | 5 ₹10,390 | 20 ₹41,560 | 10 ₹20,780 | 5 ₹10,390 | 30 ₹62,340 | 10 ₹20,780 | 4 ₹8,312 | 30 ₹62,340 |
| 7.00 | XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 25 Sqmm, 3.5 core complete all as specified and as directed by Engineer-in-Charge.
Note: - Wherever cable fixing/ connection, suitable thimble should be used as per site situation. | 500 | Running Metre | 210 ₹1,05,000 | 130 ₹65,000 Lowest | 200 ₹1,00,000 | 205 ₹1,02,500 | 290 ₹1,45,000 | 200 ₹1,00,000 | 200 ₹1,00,000 | 210 ₹1,05,000 | 205 ₹1,02,500 | 200 ₹1,00,000 |
| 8.00 | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 35 Sqmm 3.5 core complete all as specified and as directed. | 500 | Running Metre | 290 ₹1,45,000 | 190 ₹95,000 Lowest | 250 ₹1,25,000 | 340 ₹1,70,000 | 350 ₹1,75,000 | 250 ₹1,25,000 | 300 ₹1,50,000 | 250 ₹1,25,000 | 250 ₹1,25,000 | 220 ₹1,10,000 |
| 9.00 | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 50 Sqmm 3.5 core complete all as specified and as directed. | 300 | Running Metre | 360 ₹1,08,000 | 190 ₹57,000 Lowest | 300 ₹90,000 | 380 ₹1,14,000 | 410 ₹1,23,000 | 300 ₹90,000 | 420 ₹1,26,000 | 330 ₹99,000 | 315 ₹94,500 | 270 ₹81,000 |
| 10.00 | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 70 Sqmm 3.5 core complete all as specified and as directed. | 200 | Running Metre | 470 ₹94,000 | 290 ₹58,000 Lowest | 400 ₹80,000 | 470 ₹94,000 | 650 ₹1,30,000 | 400 ₹80,000 | 520 ₹1,04,000 | 400 ₹80,000 | 335 ₹67,000 | 380 ₹76,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
19 Sept 2026, 6:00 pmClosed
GE Jammu
GE Jammu c/o 56 APO Pin-180011
REPAIR/ REPLACEMENT OF LT PANEL, JUNCTION BOXES, PERIMETER/ SECURITY LIGHTS INCLUDING LT CABLE AND ALLIED ITEMS AT MIRAN SAHIB UNDER GE JAMMU
2026_MES_785374_1
GEJC-30/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
AoR of GE Jammu
Please refer Tender Documents
8 documents required · 8 mandatory
₹500
GE Jammu
₹60,000
Yes
29 Sept 2026
20 Aug 2026
21 Sept 2026
20 Aug 2026
19 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 mtr deep any type of soil getting out and levelling of bottom surface to required level for poles/ stay assembly/ cable complete all as specified and as directed. | 266.5 | Cubic Metre | 1.25 | ₹333.13 |
| - | Returning filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25m thick complete all as specified and as directed. | 226.53 | Cubic Metre | 1.25 | ₹283.16 |
| - | Removing excavated material from site to a distance not exceeding 50mtr away and depositing where directed not exceeding 1.5mtr from the starting point complete all as specified and as directed. | 39.98 | Cubic Metre | 1.25 | ₹49.97 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and as directed by Engineer-in-Charge. | 30 | Cubic Metre | 1.25 | ₹37.5 |
| - | Supply, laying and fixing DWC HDPE pipe for protection cable (orange in colour) of size 75mm dia complete with fitting and including cutting, jointing and clamping complete all as specified and as directed. | 1,454.6 | Running Metre | 1.25 | ₹1,818.25 |
| - | Taking out old/ unserviceable underground LT cables and connections including pipes, bricks or precast concrete cable cover etc from trenches/ walls/ poles of any cross sectional area and removing from site complete all as specified and as directed. | 2,078 | Running Metre | 1.25 | ₹2,597.5 |
| - | XLPE insulated, armoured heavy duty electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 25 Sqmm, 3.5 core complete all as specified and as directed by Engineer-in-Charge.
Note: - Wherever cable fixing/ connection, suitable thimble should be used as per site situation. | 500 | Running Metre | 1.25 | ₹625 |
| - | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 35 Sqmm 3.5 core complete all as specified and as directed. | 500 | Running Metre | 1.25 | ₹625 |
| - | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 50 Sqmm 3.5 core complete all as specified and as directed. | 300 | Running Metre | 1.25 | ₹375 |
| - | Description all as per Ser item No. 7.00 here-in-before but cross sectional area 70 Sqmm 3.5 core complete all as specified and as directed. | 200 | Running Metre | 1.25 | ₹250 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_880041.xls
BOQ • 0.42 MB
Tender.pdf
Tender Documents • 1.36 MB
Corrigendum01.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .