| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance 07 SUKHATOLA DUMARI KASIA KUSHINAGAR UTTAR PRADESH 274402 UDYAM UP 47 0024514 | KUSHI NAGAR | UTTAR PRADESH | 274402 | ₹1.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.0 CrRejected-Finance H O 128 1 GHOHHAT BIDYUT PALLY KATWA DIST PURBA BARDHAMAN PIN 713130 | KATWA | PURBA BARDHAMAN | WEST BENGAL | 713130 | ₹1.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 CrRejected-Finance | ₹1.1 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
6 Feb 2026, 12:00 pmClosed
THE D.G. (ROADS)
OFFICE OF THE D.G. (ROADS) ROADS DEPARTMENT KOLKATA MUNICIPAL CORPORATION 5/2 , CHOWRINGHEE PLACE KOLKATA-700 013 WEST BENGAL
DEVELOPMENT AND WIDENING OF DILAPIDATED MALPARA ROAD FROM 60 MALPARA TO NABAPALLY KALYAN SANGHA IN WARD.NO-142, UNDER BR-XVI
2025_KMC_972426_1
KMC/ROADS/2025-2026/209
Open Tender
CIVIL WORKS
150 days
MALPARA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.0 L
OFFICE OF THE D.G. (ROADS) ROADS DEPARTMENT
27 Feb 2026
27 Dec 2025
9 Feb 2026
27 Dec 2025
6 Feb 2026
6 Jan 2026
2 Jan 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (ii) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) PWD (Rds & Brdgs)-2018 It. No. 3.04 Page No.237
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (Diameter of pile to be measured at a distance of 1.5m from the thicker end.) (iii) 150mm diameter PWD (Rds & Brdgs)- 2018, Page No. 334, It. No. 18.18
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (Diameter of pile to be measured at a distance of 1.5m from the thicker end.) (i) 100mm diameter PWD (Rds & Brdgs)- 2018, Page No. 334, It. No. 18.18
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (iii) 150mm diameter PWD (Rds & Brdgs)- 2018, Page No. 334, It. No. 18.17
Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts. PWD (Rds & Brdgs)-2018, Item No-18.41, Page-338
Coal tarring on wooden surfaces including cost of materials. (a) Double coat. PWD (Rds & Brdgs)- 2018, Page No. 335 & 336 It. No. 18.27
Walling or roofing fitted and fixed complete with cut drum sheets including the cost of drums, cost of cutting drums and flattening the sheets and cost of necessary nails and screws. (Cost of empty bitumen drums issued by the Deptt. will be recovered at Rs. 100.00 for each drum) PWD (Bldg.)-2017, It. No. 30, Page No.88
Earth work in filling in foundation trenches or plinth with good earth, in layer not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) CONSOLIDATED RATE BASED ON P.W.D. CURRENT S.O.R
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (a) For Fine Sand PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-3
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl. No- 2 & 5 (g)
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) PWD (Rds & Brdgs)-2018, It. No. 4.10(i) Page No.247 & page-222 sl. No- 1 & 5 (e)
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) PWD (Rds & Brdgs)-2018, Page No.213 (Table No.3.3–1) & Page No. 251, It. No. 5.02, Table no.I-2 of pg-219, pg-220 Format-B, PWD(R&B) 2018, pg-228 item-1.03 (i), Pg-230,Table-I, It-4,
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018
Liquid Seal Coat (Type A) : Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) With Cationic Bitumen Emulsion (@ 15.00 kg / 10 sqm.) Ref. - Item No. - 5.13(A)(II), P-258 of P.W(R)D Schedule 2018, Format-B, P-220 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.- 4/A, P-230 of P.W(R)D Schedule 2018, TABLE III- 2, ROW-16, P-226 of P.W(R)D Schedule 2018, Ref-TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018, 1.03 A (C), P-227 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.- 3/A, P-230 of P.W(R)D Schedule 2018)
Edging with 2nd class bricks, laid dry lengthwise, including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres PWD (Rds & Brdgs)-2018, It. No. 9.09 Page No.276, Page-222 sl-5(b)
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2366247.xls
BOQ • 0.29 MB
10169456TENDERFORMKMCROADS202520262091stCall.pdf
Tender Documents • 0.42 MB
Download all tender documents and submit your bid