Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹3.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.7 LAccepted-Finance 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹3.7 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 | R K ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for disconnection of power cable, de -coupling of the motor from pump and checking alignment. | 1 | Nos | 4,267 ₹4,267 | 4,764 ₹4,764 |
| 2.00 | Charges for removal of foundation bolts and lifting the motor to a convenient location. | 1 | Nos | 5,261 ₹5,261 | 5,874 ₹5,874 |
| 3.00 | Charges for dismantling of motor side pulley, cooler, end covers and threading out the rotor. | 1 | Nos | 10,094 ₹10,094 | 11,270 ₹11,270 |
| 4.00 | Charges for cleaning and checking of cooler tubes | 1 | Nos | 5,321 ₹5,321 | 5,941 ₹5,941 |
| 5.00 | OVERHAULING OF STATOR: Charges for Inspection, cleaning of stator & its winding, fastening of the winding to the end ring & the inner coil spacers and packing in the overhang portion of the winding. Tightening of the wedges, spraying one coat of Dr.Beck’s varnish and drying out, Stator preheating, checking the IR Value and DC resistance. | 1 | Nos | 19,588 ₹19,588 | 21,870 ₹21,870 |
| 6.00 | OVERHAULING OF ROTOR: Charges for Inspection, cleaning of rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, soldered end winding, cleaning of overheated burnt places and applying two coats of Dr.Beck’s protective enamel and drying out. | 1 | Nos | 4,756 ₹4,756 | 5,310 ₹5,310 |
| 7.00 | Charges for Releasing the bearing, cleaning, checking and reassembling/ replacing the bearing on both ends lubrication etc., (Bearing supplied by TNPGCL (DE & NDE BEARING UNDER Contractors scope.) | 1 | Nos | 9,511 ₹9,511 | 10,619 ₹10,619 |
| 8.00 | Charges for Assembling the motor after threading in the rotor and fixing end covers. Providing rubber gasket and fixing the cooler unit, Checking the IR value, DC resistance and Tan Delta. | 1 | Nos | 15,141 ₹15,141 | 16,905 ₹16,905 |
| 9.00 | Charges for Lifting the motor, Placing at motor bed and tightening of foundation bolts, bed bolt etc. | 1 | Nos | 5,261 ₹5,261 | 5,874 ₹5,874 |
| 10.00 | Charges for Termination of power cable, coupling the motor with pump, checking alignment and trial run. | 1 | Nos | 5,261 ₹5,261 | 5,874 ₹5,874 |
Tender Value
Refer Docs
EMD Value
₹2,900
Closing Date
20 Feb 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EMI Unit-I Complete overhaul of 1 No of 500 KW 6.6 KV HT Motor CEP-IB Sl.No32299-A404-01-2 during AOH 2026
2026_EB_651929_1
CE-MTPSI-SE-ES-EMI-OT124-25-26
Open Tender
Electrical Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2,900
Yes
11 Mar 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Charges for disconnection of power cable, de -coupling of the motor from pump and checking alignment.
Charges for removal of foundation bolts and lifting the motor to a convenient location.
Charges for dismantling of motor side pulley, cooler, end covers and threading out the rotor.
Charges for cleaning and checking of cooler tubes
OVERHAULING OF STATOR: Charges for Inspection, cleaning of stator & its winding, fastening of the winding to the end ring & the inner coil spacers and packing in the overhang portion of the winding. Tightening of the wedges, spraying one coat of Dr.Beck’s varnish and drying out, Stator preheating, checking the IR Value and DC resistance.
OVERHAULING OF ROTOR: Charges for Inspection, cleaning of rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, soldered end winding, cleaning of overheated burnt places and applying two coats of Dr.Beck’s protective enamel and drying out.
Charges for Releasing the bearing, cleaning, checking and reassembling/ replacing the bearing on both ends lubrication etc., (Bearing supplied by TNPGCL (DE & NDE BEARING UNDER Contractors scope.)
Charges for Assembling the motor after threading in the rotor and fixing end covers. Providing rubber gasket and fixing the cooler unit, Checking the IR value, DC resistance and Tan Delta.
Charges for Lifting the motor, Placing at motor bed and tightening of foundation bolts, bed bolt etc.
Charges for Termination of power cable, coupling the motor with pump, checking alignment and trial run.
Charges for painting the motor complete surface and fan blade with 2 coats of standard Grey enamel paint. Area of 1 No. CEP HT Motors-28 M2
Smoke Grey enamel paint
Dr.Beck varnish
Thinner
Cylindrical roller bearing NU 326 ECM/C3, Cage: Brass, Make: SKF (Imported) (For CEP motor DE side)
Ball Bearing 7322 BECBM, Cage: Brass, Make: SKF (Imported) (For CEP motor NDE side)
Cost of consumables (Lumsum)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_781732.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid