| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹33.4 LAccepted-AOC | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹33.6 L+₹25,427 (0.76%)Rejected-Finance | L-2 | Rejected-Finance other than L-1 | |
| 3 | L-3₹36.7 L+₹3.3 L (9.94%)Rejected-Finance 1 181 KAMATCHI AMMAN KOVIL STREET KANNAN COLONY CHINTHAMANI MADURAI 625009 | MADURAI | MADURAI | TAMIL NADU | 625009 | L-3 | Rejected-Finance other than L-1 | |
| 4 | L-4₹39.8 L+₹6.4 L (19.2%)Rejected-Finance | L-4 | Rejected-Finance other than L-1 |
Tender Value
₹36.8 L
EMD Value
₹73,600
Closing Date
21 Apr 2022, 6:00 pmClosed
Sh A K Dubey IDSE SE CWE
Military Engineer Services, Commander Works Engineer, Udhampur, PO - Garhi, Udhampur-182121
PROVN OF MT SHEDS AT DEPOT AREA OF FOD UNDER GE (SOUTH) UDHAMPUR
2022_MES_513226_1
CA NO CWE/U(S)-113/2021-22
Open Tender
Civil Works
Lump-sum
180 days
UDHAMPUR
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (SOUTH) UDHAMPUR
₹73,600
6 May 2022
11 Mar 2022
23 Apr 2022
11 Mar 2022
21 Apr 2022
9 Apr 2022
Amount
BUILDING WORK (SCHEDULE 'A' PART-I) Lump sum price worked out by the Contractor for “Building Work” as listed in Schedule ‘A’ Part- I.
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-II)(SEC-I) Lump sum price worked out by the Contractor for “Internal Electrification” as listed in Schedule ‘A’ Part- II (Sec-I)
INTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-II) (SEC-II) SCHEDULE `A' PART-II, Sec-II is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
New generation energy saving and environmental friendly long life LED street light of 40 watt with high power LED as lighting source and lens embedded PC cover having TOP OPENING seperate driver compartment and impact resistance of IK07 with High efficiency long life LED with SMD LED on MCPCB Powered by Built-in, isolated electronic LED driver (SMPS based constant current supply) complete making connection and testing after fixing, complete all as specified and directed by Engr-in-charge. The specification of light fitting should meet the following : - (a) Housing of Light fitting : Aluminium Die Cast (b) Diffuser : High efficient LENS Optics (c) Operating Voltage : Between 150 V- 270V (d) Operating Temperature : -10 to +45 Degree Centigrade (e) Lumen efficacy : Not less than 100 lm/W (f) System Lumens : Not less than 2500 lm (g) Colour Temperature : Not less than 5700K (h) Surge Voltage Protection : Up to 4KV (j) Ingress protection : IP 65 (k) Total Harmonic Distortion (THD) : Not less than 20% (l) Power factor : Not less than : 0.9 (m) Line protection : Under/Over voltage Protection (n) Input Frequancy : 50 Hz
Street light brackets complete made of GI pipe of suitable size of 25 mm dia, medium grade 1.2 m long bent to shape as per te requirement with MS flat iron clamps with nuts , bolts, washers including grouting the same with wall/ pole including taking out old bracket with fitting all as specified and directed by Engr- in-Charge.
VTPN distribution board when MCCB 125 Amps, 16 KA ( as incommer) 4-way, including MCB 125 Amps SPN, with IP-43, IK-09 protection 415V, double door type including cutting chases in walls for fixing DBs making good the distubed surfaces to match with existing specifications ,fixing in repairs complete all as specified and as directed by Engr-in-Charge.
Sub Total
ROAD, PATH AND CULVERTS (SCHEDULE 'A' PART-III) Lump sum price worked out by the Contractor for “Road, Path and Culverts” as listed in Schedule ‘A’ Part- III .
EXTERNAL ELECTRIFICATION (SCHEDULE 'A' PART-IV) Lump sum price worked out by the Contractor for “External electrification” as listed in Schedule ‘A’ Part- IV .
EARTH WORK AND SITE CLEARANCE (SCHEDULE 'A' PART-V) Lump sum price worked out by the Contractor for “Earth work and site clearance” as listed in Schedule ‘A’ Part- V .
M/S Inderjit Sharma and Co.
R K BUILDERS
RAMAN CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .