Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.1 LAdmitted-Finance | -1.00% | ₹37.1 L | L1 | Admitted-Finance |
| 2 | L2₹37.3 LAdmitted-Finance | -0.50% | ₹37.3 L | L2 | Admitted-Finance |
Tender Value
₹37.5 L
EMD Value
₹74,950
Closing Date
11 May 2026, 5:00 pmClosed
EO
NPP Mirzapur
Instalation work of tubewell in makarikhoh ward at Imalaha
2026_DOLBU_1145251_1
NPP/2026-27/jalkal/15th fc/07
Open Tender
Water Supply
NPP Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,450
Yes
EO
₹74,950
Yes
30 May 2026
5 May 2026
12 May 2026
5 May 2026
11 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drilling of bore well for tube well construction by DC/RC/DTH rig machine including transportation, errection, dismantling of rig and associated T&P complete in all respect including all material, labour etc. Transportation. Errection and dismantling of Rig Machine. | 1 | job | 32,680 | ₹32,680 |
| 2 | DC/RC/Drilling. Drilling of 600 mm dia bore from G.L. to 100 m BGL | 100 | M | 2,290 | ₹2,29,000 |
| 3 | DC/RC/Drilling. Logging of bore hole by departmental/approved electrical logger. | 1 | job | 18,000 | ₹18,000 |
| 4 | TUBE WELL ASSEMBLY, M.S. Tube well assembly with all required part like plain pipe slotted pipe (as required up 50% of plain pipes) rings. Wellcap, bail plug. Clamp, reducer, central guide, structure etc. as required and as per typed design complete in all respect.
200 MM dia | 80 | M | 3,726 | ₹2,98,080 |
| 5 | Supply of pea Gravel | 39 | Cum | 7,000 | ₹2,73,000 |
| 6 | Lowering of Tube Well assembly duly welded including welding electrode and shrouding of pea Gravel complete in all respect. (Note-Axial Length of Reducer without Ring shall be measured with Casing Pipe.)
200 MM Dia | 80 | M | 250 | ₹20,000 |
| 7 | Development of Tube well
Transportation Installation Dismantling of 350/250 PSI air compressor | 1 | job | 28,320 | ₹28,320 |
| 8 | Development of Tube well
Development by 350/250 PSI air compressor | 75 | Hrs | 3,020 | ₹2,26,500 |
| 9 | Development of Tube well
Transportation Erection Dismantling of 1 Cusec OP Unit and Yield test. | 1 | job | 44,880 | ₹44,880 |
| 10 | Development of Tube well
Development of TW by 1 cusec OP Unit. | 150 | Hrs | 650 | ₹97,500 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.82 MB
BOQ_2140597.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid