Tender Value
₹7.9 Cr
EMD Value
₹15.7 L
Closing Date
26 Oct 2026, 5:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SM_TENDER CELL
GNIDA OFFICE
Providing and Fixing Pre-cast Hollow Core Slabs on Lohiya Drain from Surajpur to Pari Chowk Rotary along S.K. road, Greater Noida.
2026_GNIDA_1195828_5
SM/(E-TENDER CELL)/2026/822 DATED-09.10.2026
Open Tender
Civil Works
Percentage
180 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹6,770
₹15.7 L
13 Oct 2026
13 Oct 2026
28 Oct 2026
13 Oct 2026
26 Oct 2026
13 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. : In cement mortar (DSR-23/15.7.4) | 1,081.49 | Cum | 974.05 | ₹10,53,425.33 |
| 2 | Recovery of the cost old bricks obtained from dismantle of brick work @ 30% of brick work quantity & bricks 460 nos. per cum brick work to be assumed contractor property. (AR/GNIDA) | 1,49,246 | Nos | 4.2 | ₹6,26,833.2 |
| 3Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. | |||||
| 4Centering and shuttering including strutting, propping etc. and removal of form for : (DSR-2023/5.9) | |||||
| 4.01 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(DSR-2023/5.9.2) | 1,644 | sqm | 443.9 | ₹7,29,771.6 |
| 5Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessories for walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutout/holes of required sizes for services, yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer-in-Charge (Cost of reinforcement, Mechanical, Electrical and Plumbing inserts will be paid separately). | |||||
| 6Fabrication & Manufacturing of Prestressed Hollow Core slab (Hollow area 25 to 30%) of different thickness & modular width 1200 mm in Controlled Factory Environment with approved methodology conforming to IS 10297:1982 by using long line casting method having arrangement of proper steel bed. Concreting should be done by batch mixing plant capable of producing zero slump concrete, transported through automatic shuttels of standard make & layed on bed with the help of extruder/Slipformer, finishing, curing and also provision of steam curing. Cutting, making necessary cutout/holes of required sizes for services in slab element after achieving required strength, yard handling & stacking all complete as per approved shop drawings & design mix as per the direction of the Engineer-in-charge. (Cost of strands should be paid separately). | |||||
| 7 | Providing & laying in position Prestressing steel strands (low relaxation) on hollow core bed by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for Stressing & destressing operations as per approved make conforming to IS1343 & grade FY-1860 etc, complete as per drawings and direction of Engineer -in-charge. (DSR-2023/26.75) | 70,315.08 | Kg | 153.15 | ₹1,07,68,754.5 |
| 8 | Transportation of Precast Elements by flat bed Trailor (Double / Triple axle 40ft Length with proper accessories like A frame etc) from factory, including the cost of loading , unloading & stacking at site with the help of required capacity cranes. : Lead within 15km (DSR-2023/26.76.1) | 8,799.79 | MT | 425.7 | ₹37,46,070.6 |
| 9Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor. (DSR-26.77) | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.13 MB
BOQ_2258926.xls
BOQ • 0.26 MB
PreQ_Lohiya_Drain.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .