Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹1.9 Cr Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | ₹1.9 Cr | L1 |
| 2 | L2₹1.9 Cr+₹2.8 L (1.45%) Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | ₹1.9 Cr+₹2.8 L (1.45%) | L2 |
| 3 | L3₹2.0 Cr+₹9.6 L (5.00%) Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | ₹2.0 Cr+₹9.6 L (5.00%) | L3 |
| 4 | L4₹2.1 Cr+₹14.5 L (7.59%) Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | ₹2.1 Cr+₹14.5 L (7.59%) | L4 |
| 5 | L5₹2.1 Cr+₹20.8 L (10.9%) Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2) | ₹2.1 Cr+₹20.8 L (10.9%) | L5 |
| Sl No | Description | Qty | Unit | ANKUR CONSTRUCTION L3 | MAHANTI ELECTRICALS L4 | S M SAQUIB L2 | M/s Singh Building Material and Hardware Paint L5 | SAURABH ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1 | Recall-Establishment of Research dairy farm at BHU (SH:- Up-gradation and renovoation of Gaushala at BHU Varanasi (Package-2). | - | - | -19.5 ₹2,01,01,977.81 | -17.51 ₹2,05,98,908.68 | -22.22 ₹1,94,22,755.7 | -15.01 ₹2,12,23,193.71 | -23.33 ₹1,91,45,573.15 Lowest |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
26 Aug 2022, 3:00 pmClosed
EE&SM( C) -3
Vinay Kumar Tiwari
BHU Project Varanasi 3 Behind Central Office CPWD BHU
Recall-Establishment of Research Dairy Farm at BHU(SH: Up-gradation and renovation of Gaushala at BHU, Varanasi (Package-2)
16409
09/EE/BHUPD-3/2022-23
OPEN
Civil Works - Buildings
NCB
5 months
Varanasi, Uttar Pradesh
8 documents required · 8 mandatory
₹5.0 L
Not Applicable
26 Aug 2022
18 Aug 2022
26 Aug 2022
26 Aug 2022
23 Aug 2022
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITGAUSHALA18082022.pdf
document • 2.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .