| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹588 CrAdmitted-Finance | ₹588 Cr | L1 | Admitted-Finance |
| 2 | L2₹619 CrAdmitted-Finance | ₹619 Cr | L2 | Admitted-Finance |
| 3 | L3₹624 CrAdmitted-Finance | ₹624 Cr | L3 | Admitted-Finance |
| 4 | L4₹628.9 CrAdmitted-Finance FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹628.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹633.3 CrAdmitted-Finance | ₹633.3 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | C S CONSTRUCTION COMPANY PVT. LTD. L12 | KCC Buildcon Private Limited L6 | PNC Infratech Ltd L5 | SHIVALAYA CONSTRUCTION CO. PVT LTD L13 | JSP Projects Pvt. Ltd. L4 | DILIP BUILDCON LIMITED L10 | CEIGALL INDIA LIMITED L9 | BRIJ GOPAL CONSTRUCTION CO. PVT. LTD L2 | H.G. Infra Engineering Limited L7 | Jandu Construction India Pvt. Ltd. L3 | M/s Ravi Infrabuild Projects Limited L8 | CDS INFRA PROJECTS LIMITED L1 | Montecarlo Limited L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Date: | ||||||||||||||||
| 2.00The Chief Engineer – Regional Office, MoRTH, NH Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar Lucknow-226022 | ||||||||||||||||
| 3.00Sub: BID for Construction of Deoria Bypass from existing Km. 27.140 to existing Km. 46.780 (Design Km. 49.109) on NH–727A (Design length 21.969 Km.) to four lane with paved shoulder configuration under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh. | ||||||||||||||||
| 4.00Dear Sir, With reference to your RFP document dated 03.10.2023, I/we, having examined the Bidding Documents and understood their contents, hereby submit my/our Bid for the aforesaid Project. The Bid is unconditional and unqualified. 2. 2. I/ We acknowledge that the Authority will be relying on the information provided in the Bid and the documents accompanying the Bid for selection of the Concessionaire for the aforesaid Project, and we certify that all information provided in the Bid are true and correct; nothing has been omitted which renders such information misleading; and all documents accompanying the Bid are true copies of their respective originals. 3. The Bid has been quoted by me/us after taking into consideration all the terms and conditions stated in the RFP, Draft Concession Agreement and its Schedules, our own estimates of costs and after a careful assessment of the site and all own the conditions that may affect the Project cost and implementation of the Project.. 4. I/ We acknowledge the right of the Authority to reject our Bid without assigning any reason or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever.. | ||||||||||||||||
| 5.005. In the event of my/ our being declared as the Selected Bidder, I/we agree to enter into a Concession Agreement in accordance with the draft that has been provided to me/us prior to the Bid Due Date. We agree not to seek any changes in the aforesaid draft and agree to abide by the same. 6. I/ We shall keep this offer valid for 120 (one hundred and twenty) days from the BID Due Date specified in the RFP. | ||||||||||||||||
| 6.00 | 7. I/ We hereby submit our BID consisting of Bid Project Cost of Rs. | 10 | Nos | 7,21,00,00,000 ₹721 Cr | 6,39,00,00,000 ₹639 Cr | 6,33,33,00,000 ₹633.3 Cr | 7,30,00,00,000 ₹730 Cr | 6,28,89,00,000 ₹628.9 Cr | 6,87,90,00,000 ₹687.9 Cr | 6,71,00,00,000 ₹671 Cr | 6,19,00,00,000 ₹619 Cr | 6,55,11,00,000 ₹655.1 Cr | 6,24,00,00,000 ₹624 Cr | 6,68,22,00,000 ₹668.2 Cr | 5,88,00,00,000 ₹588 Cr | 7,14,00,00,000 ₹714 Cr |
| 7.00exclusive of GST for for undertaking the aforesaid Project in accordance with the Bidding Documents and the Concession Agreement. | ||||||||||||||||
Tender Value
₹718.5 Cr
EMD Value
₹7.2 Cr
Closing Date
6 Mar 2024, 11:00 amClosed
Chief Engineer - Regional Officer, MoRTH Lucknow
Chief Engineer Regional Office, MoRTH, NH Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar Lucknow 226022
RFP for Construction of Deoria Bypass from existing Km. 27.140 to existing Km. 46.780 (Design Km. 49.109) on NH727A (Design length 21.969 Km.) to four lane with paved shoulder configuration under Hybrid Annuity Mode (HAM) in the State of UP.
2023_MoRTH_774307_1
CE-RO/LKO/NH(O)/06/Deora Bypass(NH727A)/2022-23
Open Tender
Civil Works - Roads
730 days
DEORIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹80,000
AS PER BID DOCUMENT
₹7.2 Cr
Chief Engineer - Regional Office,MoRTH Lucknow
21 May 2024
3 Oct 2023
7 Mar 2024
3 Oct 2023
6 Mar 2024
3 Oct 2023
8 Nov 2023
Amount
The Chief Engineer – Regional Office, MoRTH, NH Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar Lucknow-226022
Sub: BID for Construction of Deoria Bypass from existing Km. 27.140 to existing Km. 46.780 (Design Km. 49.109) on NH–727A (Design length 21.969 Km.) to four lane with paved shoulder configuration under Hybrid Annuity Mode (HAM) in the State of Uttar Pradesh.
7. I/ We hereby submit our BID consisting of Bid Project Cost of Rs.
exclusive of GST for for undertaking the aforesaid Project in accordance with the Bidding Documents and the Concession Agreement.
BRIJ GOPAL CONSTRUCTION CO. PVT. LTD
Jandu Construction India Pvt. Ltd.
JSP Projects Pvt. Ltd.
PNC Infratech Ltd
KCC Buildcon Private Limited
H.G. Infra Engineering Limited
M/s Ravi Infrabuild Projects Limited
CEIGALL INDIA LIMITED
DILIP BUILDCON LIMITED
Montecarlo Limited
C S CONSTRUCTION COMPANY PVT. LTD.
SHIVALAYA CONSTRUCTION CO. PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_813949.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid