Providing for 10 HP pumpset and Construction of Pump room at Karakottai in Karakottai Panchayat.
2024_RDTN_513281_1
Providing for 10 HP pumpset and Construction of Pumproom at Karakottai in Karakottai Panchayat.
Open Tender
Civil Works
Works
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,100
Yes
24 Dec 2024
23 Dec 2024
23 Dec 2024
23 Dec 2024
23 Dec 2024
23 Dec 2024
Amount
Providing for 10 HP pumpset and Construction of Pumproom @ Karakottai in Karakottai Panchayat.
Supply and delivery of 10 HP Submercible Pumpset heavy duty 200LPMx75M Head etc.,complete
Supply of Pannel board to suit 10 HP for Submercible Pumpset etc
Supply and delivery of 4 sqm submercible cable for Pumpset errection with excise duty
Supply and delivery of 65 mm UPVC Pipe for Pumping on Main
Charges for developing the Borewell with air compressor of 600 CFM capacity (Minimum 8 Hours) including transportation, labour and fuel charges for compressor as directed by TWAD Officers and conducting yield test by ‘V’ notch method.
Cost of PVC specials confirming to relevant ISI Specification etc.,complete
65mm GI Elbow
65mm GM Gate Value
65mm GM Non Return Value
65mm GI flange set
65mm MS Clamp Set
150mm MS Borewell cover
Provision for EB Service Connection Charges
Labour charges for errection of pumpset etc
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with ex
Supplying and filling in foundation and basement and trenches with FILLING SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete - rate for 10 cu.m
Centring for sides and soffits including cost and conveyance of all labour charges etc complete.
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
R.C.C. 1:11/2 :3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete - rate for 10 Cu.m
BRICK WORK in cement mortar 1:5 (One cement and five sand) using second class country bricks of size 23cm x 11cm x 7cm for the following including curing etc., complete complying with standard specifications.
SPECIAL CEILING PLASTERING and finishing all the RCC exposed surfaces such as RCC slabs, sunshades, canopies, staircase steps, landing slabs, etc. with cement mortar 1:3,10mm thick and including hacking the surfaces and provid
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Pressed Tiles over the RCC roof slab in the proposition being brickjelly to lime 32:12:1/2 by volume and laid into a single layer and consolidate to required finished thickness beating the mixture with wooden beaters keeping the surface constantly wetted by sprinking lime jaggery water including all other labour charges etc., complete and one layer of pressed tiles set in c.m. 1:3 etc., complete.
Towards the cost of steel door of size 0.90m x 2.10m including all charges etc.
Towards the cost of ventilator of size 0.60m x 0.450m including all charges etc
Distember two coats over one coat of primary coat including cleaning preparing the surface one coat of primer.
Emulsion two coats with Exterior emulsion over one coat of primary coat including cleaning preparing the surface
Painting two coats over new iron with ready mixxed paint of approved colour and quality including cost and conveyance of all materials towork site and all labour charges etc. complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
THIRUMALAI BOREWELLS (BID ID -1217235)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .