| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15,927.90Accepted-AOC | ₹15,927.90 | L1 | Accepted-AOC Ist Lowest tenderer |
| 2 | L2₹17,911.20Rejected-Finance | ₹17,911.20 | L2 | Rejected-Finance IInd Lowest tenderer |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
22 Mar 2022, 2:00 pmClosed
EXECUTIVE ENGINEER
GST REGISTRATION AND PAN CARD NUMBER
SPECIAL REPAIRS TO RCC ROOF,FLOORING AND FACE LIFTING THE EXISTING BUILDING IN CRS -10 AT CORPORATION BUILDING OPPT BUS STAND CHINNA ANUPPANADY AT MADURAI TALUK IN MADURAI DISTRICT
2022_TNCSC_225930_1
EE/DB/DB/F-MDU/2022
Open Tender
Civil Works
Item Rate
30 days
MADURAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1,000
22 Jun 2022
16 Mar 2022
23 Mar 2022
16 Mar 2022
22 Mar 2022
16 Mar 2022
Amount
CIVIL WORKS
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls a.Clean Removal of Cement Plaster
b.Pressed Tiles in Roof Portion
Providing weathering course in brick jelly lime concrete 20mm size in pure slaked lime over RCC roof slab, the projection being 32:12.5 for required depth and laid with required slope and thickness
Finishing the top of roof with one course of pressed tiles of size 23 x 23 x 2 cm of approved quality in cement mortar 1:3 12mm thick with water proofing compound confirming to IS at 2% by weight of cement used and the top pointed with same mortar is mixed with red oxide to the full depth of tiles etc., complete complying with standard specifications and as directed by the departmental officers
Paving the floor with fine polished cuddapah stone slab of 38/40mm thick laid over cement mortar 1:4 (one cement and four sand) 20mm thick over the existing bed of cement concrete 1:5:10 (one cement,five sand and ten aggregate)vand pointing the pointing the joints to full depth of slas with same mixed with black oxide and the top surface rendered smooth, curing, etc., The cuddapah stone slabs andother materials to be used shall be got approved by the executive engineer concerned befre use on work, etc., complete complying with standard specifications ( using New cuddapah slab)
Plastering with Cement mortor 1:5 (one cement,five sand) with 12 mm thick including cost of all materials,labour charges for finishing and curring etc., complete
Colour Washing two coats with freshly burnt white shell lime in all floors including cost of lime, brushes, scaffolding charges etc., complete complying with standard specification.
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting two coats to existing Old iron works with approval quality and colour complete complying with standard specification.
S K VADIVELMURUGAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].