Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -25.20% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹22,268.40 (15.4%)Admitted-Fee/PreQual/Technical/Finance | -13.70% | ₹1.7 L+₹22,268.40 (15.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
Closing Date
17 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW SPN
EXECUTIVE ENGINEER REW SPN
C/O DRAIN, P BUND AND CULVERT GROM HO GH HASSAN BHAT TO HO GULL MOHD BHAT AT MALIBUGH
2026_RDPR_318930_4
Enit No 067 of 2026-27
Open Tender
Civil Works
Percentage
30 days
Shopian
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Rural Development and Panchayati Raj
Exempted
21 Sept 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
17 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site Clearence by way of Engagement of labors removal of bushes and big boulders etc | - | Lab | - | - |
| 0.0 | Earth work excavation by manual means for trenches foundation ete upto depth 1.5 m and including all carriages lead and lift 30m form site of work | 1 | Cum | - | - |
| 0.0 | Supply and Placing of Stone Soling hand packed tightly in bed and concrete including levelling & ramming and carriage | - | Cum | - | - |
| 0.0 | Placing and laying in position PCC of specified grade excluding the cost of centring and shuttering 1: 4 : 6 | - | Cum | - | - |
| 0.0 | Providing and fixing Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | sqm | - | - |
| 0.0 | p/l OF rcc Cement Concrete M 15 Mix 1:2:4 | - | Cum | - | - |
| 0.0 | Placing and laying in position PCC of specified grade excluding the cost of centring and shuttering 1: 3:6 | 1 | Cum | - | - |
| 0.0 | Providing and fixing Centring and shuttering including strutting, propping etc. and removal of formwork complete job | - | sqm | - | - |
| 0.0 | Reinforcement for RCC work Fe 550 | - | Kg | - | - |
| 0.0 | Provision for signboard & photographs and other unforseen items | - | Job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1053838.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .