Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹160.0 CrAccepted-AOC | ₹160.0 Cr | 1 | Accepted-AOC L1 bidder |
Tender Value
Refer Docs
EMD Value
₹2.0 Cr
Closing Date
21 Aug 2023, 1:00 pmClosed
Director (Systems Operations)
Chennai Metro Rail Limited
Design Manufacture Supply Installation Testing and Commissioning of Platform Screen Doors for Corridor 3(Sholinganallur Lake to Sipcot 2)and Corridor 5(Grain Market to Elcot) of CMRL Phase II.
2023_CMRL_758768_1
CMRL/PHASE II/SYS/ASA12A/2022
Global Tenders
Miscellaneous Works
800 days
Chennai
Please refer Tender documents.
6 documents required · 6 mandatory
₹40,000
CMRL BANK ACCOUNT
₹2.0 Cr
Chennai Metro Rail Limited,
13 Dec 2023
22 Jun 2023
22 Aug 2023
22 Jun 2023
21 Aug 2023
14 Aug 2023
22 Jun 2023 - 4 Jul 2023
5 Jul 2023
CMRL/PHASE–II/SYS/ASA12/2022
Indian Rupees
Foreign Currency 1
Foreign Currency 2
Description of Work / Item(s)
Training, Operation & Maintenance Manual and Maintenance Assistance
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 Employer’s requirement.
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Description of Work / Item(s)
Contract Spares, Special tools, Testing Equipments, Measuring Instruments and Furniture
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
US Dollar
European Euro
US Dollar
European Euro
US Dollar
European Euro
Description of Work / Item(s)
Foreign Currency 2
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in Chennai
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for imparting training to Employer’s Technical Personnel, in off-shore locations
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Cost for instructor week for Imparting training to Employer’s operating personnel, in Chennai
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Delivery & commissioning of Computer based training systems at Chennai, as stipulated in Part 2 – Employer’s requirement.
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Operating & Maintenance Manuals (Draft as well as Final, in required copies)
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Cost for deputing Supervisory experts in various sub-systems of Signaling for on-the-job training, supervise maintenance & trouble-shooting, as per Employer’s requirements
Contract Spares as per final list of Spares on completion of detailed design (with Notice of No objection from the Engineer)
Contract Tools, Testing Equipments & Measuring instruments as per final list of Tools, Testing Equipments and measuring instruments, on completion of detailed design (with Notice of No objection from the Engineer)
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
Furniture for various Control & Equipment Rooms, as per Employer’s requirements
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid