Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical VILL KUSTORE P O ALIGRAM DIST BIRBHUM | BIRBHUM | Accepted-Technical Accepted |
| 4 | Rejected-Technical 119 ABDUS SAMAD ROAD P O P S BERHAMPORE DIST MURSHIDABAD W B PIN 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | Rejected-Technical Annual turnover mismatch with Balance sheet |
| 5 | Rejected-Technical DAKSHIN PAROKATA ALIPURDUAR WEST BENGAL | ALIPURDUAR | WEST BENGAL | 736202 | Rejected-Technical Annual turnover mismatch with Balance sheet |
Tender Value
₹9.5 L
EMD Value
₹18,935
Closing Date
9 Jul 2026, 6:00 pmClosed
District Engineer, Alipurduar Zilla Parishad
Alipurduar Zilla Parishad
Construction of Boundary Wall for EVM/VVPAT Warehouse of Alipurduar District
2026_ZPHD_1030513_1
NIT NO- WBZP/12-DE/APD/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
Alipurduar
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,935
Yes
Meeting Hall of Alipurduar Zilla Parishad
25 Sept 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.a) Depth of excavation not exceeding 1,500 mm. | 81.34 | cum | - | - |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation withwater, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 16.27 | cum | 521.07 | ₹8,477.81 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1 | Sq.M | 324 | ₹323.68 |
| 4 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor(a) 1:3:6 proportion | 6.62 | cum | 3,262.16 | ₹21,595.5 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) River Bazree . Ground floor | - | Cum | 4,505.15 | - |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. Ground floor (JSW/JSPL/Shyam/SRMB/SSL/BMASL/Electrosteel) Ground floor | - | MT. | 61,139.01 | - |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation | 1 | Sq.M | 205 | ₹204.8 |
| 8 | (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. GROUND FLOOR. | 1 | SqM. | 328 | ₹327.67 |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. Ground floor: | - | Sqm | 666.31 | - |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4 cement mortar (a) 20 mm thick plaster Ground floor | - | Sqm | 157.66 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_2530497.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .