Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | ₹20.0 L | L1 | Admitted-Finance |
| 2 | L2₹21.1 LAdmitted-Finance | ₹21.1 L | L2 | Admitted-Finance |
| 3 | L3₹25.4 LAdmitted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | ₹25.4 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hindustan Electric Work L2 | M/S ALOK CONSTRUCTION L3 | M/S VISHWAATH CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 60 Km.) | ||||||
| 1.01 | Safe cartage of 8.5/9.0/11 Mtr. Long PCC Poles. | 230 | Nos. | 805 ₹1.9 L | 820 ₹1.9 L | 800 ₹1.8 L |
| 1.02 | Safe cartage of 09/11.0 Mtr. Long ST poles. | 20 | Nos. | 805 ₹16,100 | 820 ₹16,400 | 800 ₹16,000 |
| 1.03 | ACSR Weasel Conductor | 8 | km | 2,500 ₹20,000 | 1,600 ₹12,800 | 2,200 ₹17,600 |
| 1.04 | AB Cable (1x16+1x25) sqmm | 2 | km | 2,000 ₹4,000 | 3,500 ₹7,000 | 3,000 ₹6,000 |
| 1.05 | AB Cable (3x50+1x35+1x16) sqmm | 1 | km | 2,000 ₹2,000 | 3,500 ₹3,500 | 3,000 ₹3,000 |
| 1.06 | Distribution Box Three Phase/Single Phase | 10 | Nos | 125 ₹1,250 | 120 ₹1,200 | 100 ₹1,000 |
| 1.07 | Transformer 25 KVA | 20 | No | 3,500 ₹70,000 | 3,500 ₹70,000 | 3,000 ₹60,000 |
| 1.08 | Transformer 63 KVA | 10 | No | 4,000 ₹40,000 | 4,000 ₹40,000 | 3,500 ₹35,000 |
| 1.09 | Transformer 100 KVA | 5 | No | 4,500 ₹22,500 | 4,500 ₹22,500 | 4,000 ₹20,000 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
25 Mar 2026, 5:00 pmClosed
SE, EDC, Ayodhya
SE, EDC civil line, Ayodhya.
123 H(F)(W)/2025-26
2026_MVVNL_1123293_1
123 H(F)(W)/2025-26
Open Tender
Electrical Works
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹20,000
1 Apr 2026
11 Mar 2026
26 Mar 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 60 Km.)
Safe cartage of 8.5/9.0/11 Mtr. Long PCC Poles.
Safe cartage of 09/11.0 Mtr. Long ST poles.
ACSR Weasel Conductor
AB Cable (1x16+1x25) sqmm
AB Cable (3x50+1x35+1x16) sqmm
Distribution Box Three Phase/Single Phase
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
11 KV Cable Jointing Kit Outdoor 3x70 sqmm
11 KV Cable Jointing Kit indoor 3x120 sqmm
11 KV XLPE Cable 3x70mm2 /3x120mm2/3x185 sqmm
11 KV Pilfer Proof Metring Cubical
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC/ST Pole as per RESPO Norms.
Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16) as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Erection & Commissioning of of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x70/3x120/3x185 mm2 outdoor XLPE Cable Box.
Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x120 mm2 Indoor XLPE Cable Box.
Laying of underground 11 KV 3x70/3x120 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Installation of 11 KV Pilfer Proof Metering Cubical
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
BOQ_2092592.xls
BOQ • 0.24 MB
TF.pdf
Tender Documents • 1.34 MB
Download all tender documents and submit your bid