| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC BANKOLA ROAD UKHRA BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | ₹2.9 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹3.0 L+₹10,001.66 (3.41%)Rejected-Finance BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹3.0 L+₹10,001.66 (3.41%) | L2 | Rejected-Finance TC recommendation |
| 3 | L3₹3.1 L+₹19,382.66 (6.60%)Rejected-Finance | ₹3.1 L+₹19,382.66 (6.60%) | L3 | Rejected-Finance TC recommendation |
| Sl No | Description | Qty | Unit | MUKHERJEE AND CHATTERJEE CONSTRUCTION L3 | RAM CHANDRA SARKAR L2 | M/S. B. N. SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00Departmental estimate for marching one SDL-705 & UDM 209 with all electrical accessories from 51/-19R RVIIA To 56L/R RVII Scam of no-8 pit of Bankola Colliery | ||||||
| 2.00 | A) Dismentle of track line & set up the power line for SDL-705 & UDM 196 & start marching from 51./-19R TO 81/-15R | 1 | ls | 22,500 ₹22,500 | 20,650 ₹20,650 | 19,908.37 ₹19,908.37 Lowest |
| 3.00 | B) Again dismentle the power line from section & transport power cable and GEB& ACB to change machine from 1L/9D substation and marching all clectrical accessories up to 14L/-5R | 1 | ls | 65,200 ₹65,200 | 63,650 ₹63,650 | 62,512.43 ₹62,512.43 Lowest |
| 4.00 | C) Again dismentle the power line from 1L/9D substation and charged the power from nearest power source at 14L/-2R and marching to 27L/-2R with Opening pipe line /stowing & track line & refitting it. | 1 | ls | 65,200 ₹65,200 | 63,650 ₹63,650 | 62,512.43 ₹62,512.43 Lowest |
| 5.00 | D) Again dismentle the power line from 141/-2R and transport the total cable and electrical accessories and charged the power from 25L/2R substation and marching the machine from 271/-2R to 401./4R with opening pipe line and refitting it | 1 | ls | 65,200 ₹65,200 | 63,650 ₹63,650 | 62,512.43 ₹62,512.43 Lowest |
| 6.00 | E) Again dismentle the power line from 25L/2R substation and transport the total cable with electrical accessories & charged the power line from 50L/2R substation &marching the machine from 401./4R to 56L/4R | 1 | ls | 25,500 ₹25,500 | 25,200 ₹25,200 | 23,198.6 ₹23,198.6 Lowest |
| 7.00 | F) Arranged and placed all the cable .,GEB& ACB near new panel district & start operation | 1 | ls | 21,650 ₹21,650 | 20,500 ₹20,500 | 18,179.76 ₹18,179.76 Lowest |
| 8.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
15 Sept 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
marching one SDL 705 and UDM 209 with all electrical accessories from 5L/-19R RVIIA to new panel 56L/4R RVII Seam of no-8 pit of Bankola Colliery
2025_ECL_343314_1
ECL/GM/BA/E TENDER/25-26/ENM/104 Dt 05.09.2025
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Bankola Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,700
29 Apr 2026
5 Sept 2025
16 Sept 2025
5 Sept 2025
15 Sept 2025
5 Sept 2025
5 Sept 2025 - 8 Sept 2025
Amount
Departmental estimate for marching one SDL-705 & UDM 209 with all electrical accessories from 51/-19R RVIIA To 56L/R RVII Scam of no-8 pit of Bankola Colliery
A) Dismentle of track line & set up the power line for SDL-705 & UDM 196 & start marching from 51./-19R TO 81/-15R
B) Again dismentle the power line from section & transport power cable and GEB& ACB to change machine from 1L/9D substation and marching all clectrical accessories up to 14L/-5R
C) Again dismentle the power line from 1L/9D substation and charged the power from nearest power source at 14L/-2R and marching to 27L/-2R with Opening pipe line /stowing & track line & refitting it.
D) Again dismentle the power line from 141/-2R and transport the total cable and electrical accessories and charged the power from 25L/2R substation and marching the machine from 271/-2R to 401./4R with opening pipe line and refitting it
E) Again dismentle the power line from 25L/2R substation and transport the total cable with electrical accessories & charged the power line from 50L/2R substation &marching the machine from 401./4R to 56L/4R
F) Arranged and placed all the cable .,GEB& ACB near new panel district & start operation
Total impact of GST for the purpose of CTC
RAM CHANDRA SARKAR (BID ID -1182777)
MUKHERJEE AND CHATTERJEE CONSTRUCTION (BID ID -1182773)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_355873.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .