Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC HOUSE NO 108 WARD NO 08 SHAKTI NAGAR DHAR ROAD UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.3 L+₹1.4 L (14.5%)Rejected-Finance | L2 | Rejected-Finance Other than L1 |
Tender Value
₹11.4 L
EMD Value
₹22,800
Closing Date
20 Jul 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE UTILITIES
GE UTILITIES UDHAMPUR PO GARHI PIN 182121 UDHAMPUR
Repair/Maintenance of electric lift at Ashok Vihar, Chunni Lal Vihar and Old Medical area under GE Utilities Udhampur
2019_MES_253782_5
GE/U-04/2019-20
Open Tender
Miscellaneous Works
Item Rate
270 days
UDHAMPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE UTILITIES UDHAMPUR
₹22,800
Yes
9 Sept 2020
23 Jun 2020
22 Jul 2020
23 Jun 2020
20 Jul 2020
6 Jul 2020
60 days
Amount
Taking down induction Motor(Traction Machine 9 KW,Gear Ratio; 49:1,Traction sheave Spec ɸ 620 x 5x ɸ 13) from foundation to machine room of lift by disconnecting electrically and mechanically, loading / inculding transporting to workshop for repair rewinding with ISI marked copper winding wire of existing gauge /size ISI marked insulating paper, varnish, replacement of bearings two Nos. of DE and NDE etc transporting back the motor after repairs, installing on foundation, aligning the same reconnecting electrically and mechanically and testing on Full load for satisfactory functioning.
S&F in replacement of Brake liner of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Brake sensor at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Tensioning device at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Rope Gripper of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Brake coil of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of sheave of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of rope of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of DVR of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement Micro-processor based variable voltage variable frequency (vvvf) type main controller with closed loop system of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of MCU Card ( Main mother board Card) driveat of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Transformer (TRF) Ratio 110 volt to 230 volt at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Relays, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of inspection switch of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of over speed governer at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of line choke of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of automatic transfer switch 4P, rated 100 Amp, Ue: 415 Volt, Ref: IEC: 60947-6-1 Closing current 3.0 Amp/230 V AC, triping current:0.5 Amp/230 V AC with enclosure. Make: Schiender or equivalent in L&T/Philips
S&F in replacement of electronic card of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of opening push buttons with plate complete set of buttons of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of blower fan 300mm heavy duty suitable for AC 230V of lift complete all as specified and directed by Engr-in-Charge. Make: Bajaj/Crompton/Philips
S&F in replacement of LED cabin light 9 Watt of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Guide shoe of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of LOP button of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of LOP plate of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of LCU Card of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Cabin Display of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Inspection box, Manual Operating of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Lock accessories of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of door open motor of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of door open drive of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of following switch as per sample are as under: - (a) P.T switch (b) Over load switch (c) Limit switch (d) Read switch
S&F in replacement of Arrival Gong of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of Travelling Cable of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of all door rope of make as per site requirement of lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of door roller, door shoe and all type of door accessories at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
S&F in replacement of TR sensor (door sensor) at lift, make as per sample complete all as specified and directed by Engr-in-Charge.
Supply and laying in replacement of cable XLPE insulated screened PVC bedded galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 volts grade with stranded aluminium conductor of size 16 sqmm 3½ core complete all as specified and directed by Engr-in-Charge.
Supply and laying in replacement cable XLPE insulated screened PVC bedded galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 volts grade with stranded aluminium conductor of size 25 sqmm 3½ core complete all as specified and directed by Engr-in-Charge.
Excavation in trenches not exceeding 1.50 mtr wide and not exceeding 1.50 mtr in depth and getting out in soft/loose soil complete all as specified and directed by Engr-in-Charge.
Removal of excavated materials (soil) to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed by Engr-in-Charge.
Returning, filling in including spreading, leveling and well ramming in layers not exc 25cm in trenches complete all as specified and directed by Engr-in-Charge.
M&L for sand cushioning to under ground cable provided with a layer of sand 8 cm before and 15 cm after laying of the cable complete all as specified and directed by Engr-in-Charge.
Supply and fixing brick covering with width equal to length of brick as mechanical protection to cable using sub class 'B' bricks laid flat size 230x115x75mm complete all as specified and directed by Engineer-in-Charge.
S&F in replacement of APC/UPS, Model 3000 VA, 14 A of lift complete all as specified and directed by Engr-in-Charge. Make: Schneider or equivalent in TATA/APLAB
Periodical servicing by rep of OEM of the lift to maintain in a reliable, safe and efficient manner using latest techniques & experts by carrying out planned maintenance in a systematic and controlled manner by regularly examing, testing, lubricating and adjusting of all the items of lifts with inculding repair/ replacement of all defective parts i.e all type of mechanical and electrical items ,check that lift stop in downward direction properly with 25% overload with operation of the "emergency " stop when lift is moving at full speed, check and lubricate by grease cup or top up oil on sleeve type bearing on: Motor shaft,deflector sheave shaft,governor pulley. Check and lubricate sleeve of governor tensioning pull at the pit. Controller:- Clean contacts and shields with carbon tears cholride. Move relay armature by hand for free movement and see that contacts are aligned. Replace carbon contacts if worn out, Check fuses of controller and mains, Brake oil in dash pots. Check flexible leads to relay. Check and adjust carbon brushes spring pressure commutator reseat brushed. Greasing bearing. AC motors:- Lubricate bearing. Clean ventilation passenger. Inspect for tray noises. Lubricate bearing and top up oil in gear box.
Brake:- Clean if oil and trace source of oil leakage. Adjust clearance between shoes and drum, clean contacts, check tape safety switch, lubricate shaft bearing, Check tape safety switch. Governor: Check that the levers work smoothly, check that electrical contacts opens before the rope gets locked. Ropes:- Check condition of hoist ropes and governor ropes, Check slack rope if too dry. Hoist way: Lubricate guides and guide shoes, check that the buggers are in porper position and measure and record counter weight buffer cleans with car at the top. Retring car and locks: Check operation of car an lock from the top at each landing , check that retiring car solenoid is not getting over heated and that movemnet of car is smooth, check all the locks are functioning properly mechanically and electrically after opening the covers check all sets screws and springs and replace if necessary the lever should lock the brake properly,
check that the retiring car does touch the lock roller at the landing which is being passed, check that car gate switch operated properly, check condition of traveling cable and termination at junction boxes, check guide clamps and adjust, after physical inspection, get the lift to over travel by holding from the controller and see that the switches operate properly, check door closer safety, clean and adjust, if necessary, lubricate top track and door motor and linkage, check that landing doors can be opened by emergency keys. Machine room: Check and adjust overload relay and phase failure relay, check power wiring termination in switch, motor , controller and power switching relays, check lubricants of all equipments.
MAX ELEVATOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .