Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,589
Closing Date
10 Jul 2026, 6:30 pm3d left
Exe. Engineer, Alipurduar Highway Division
O/o. the Exe. Engineer, Alipurduar Highway Division, P.W.(R)Dte., Manna Dey Street, College Halt, Alipurduar - 736 122
Moonsoon preparedness work for Falakata Highway Sub-Division under the Alipurduar Highway Division, P.W.(Roads)Dte. in the district of Alipurduar during the year 2026-27.
2026_WBPWD_5016160_1
WBPWD(R)/AHD/EE/NIT- 05(e)/2026-27
Open Tender
CIVIL WORKS
90 days
Falakata Highway Sub-Division
Please refer Tender documents.
7 documents required · 7 mandatory
₹13,589
Yes
2 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in-charge. [Rate provided is inclusive of the cost of stone boulders and sausage crate] | 209.25 | m3 | 1,138.85 | ₹2,38,304.36 |
| 2 | Supply and Weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the Engineer-in-charge including cost of supply of G.I. wire. (With 100mm x 100mm mesh.) | 1 | m2 | 201 | ₹200.8 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge. I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means. a) upto 3m. depth (iv) Without pumping out water and shoring | 75 | m3 | 114 | ₹8,550 |
| 4 | Supplying empty Cement bags in good condition. Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags. | 2,000 | each | 17.36 | ₹34,720 |
| 5 | Bamboo Pile Walling made of 6.5cm to 7.5cm dia bamboo (in single line) driven about half-length into ground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100mm. at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc. (iii) With bamboos of length above 2.50m. and upto 3.00m. | 60 | m | 735 | ₹44,100 |
| 6 | Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side. | 150 | m3 | 240.75 | ₹36,112.5 |
| 7 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150mm. Average thickness finished with outward cross-grade of 1 in 30. | 2,000 | m2 | 12.2 | ₹24,400 |
| 8 | Patching of potholes by draining water, cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse with new materials as per requirement, filling the pothole area with additional volume of crushed stone materials / laterite / Jhama / broken shingles / coated stones of Pakur variety etc. and screenings as applicable, and compacting the same with static roller as per Water Bound Macadam Specification, including cost of all materials and machineries. | - | m3 | 1,782.7 | - |
| 9 | Add GST @ 18% on Rs. 05,70,089.87 i.e. total amount over item no. 1 to 08 | 5,70,089.87 | % | 18 | ₹1,02,61,617.66 |
| 10 | Add Labour Welfare Cess @ 1% of Rs. 06,72,706.05 i.e. total amount Item No. 1 to 09 | 6,72,706.05 | % | 1 | ₹6,72,706.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 0.52 MB
BOQ_5085402.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid