Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.3 LAccepted-AOC 16F 1K NEW MARKET BAMRAULI NEAR BAMRAULI RAILWAY STATION ALLAHABAD UTTAR PRADESH 211012 | PRAYAGRAJ | UTTAR PRADESH | 211012 | 1 | Accepted-AOC L1 | |
| 2 | 2₹23.2 L+₹85,922.84 (3.85%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹23.6 L+₹1.2 L (5.42%)Rejected-AOC | 3 | Rejected-AOC L3 |
Tender Value
₹22.4 L
EMD Value
₹22,500
Closing Date
15 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
15/ETC-II(P)/ 2023-2024
2023_UPTCL_810363_1
15/ETC-II(P)/ 2023-2024
Open Tender
Electrical Works
Item Rate
120 days
Rewa-Road, Koraon
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,ETD-NAINI,PRAYAGRAJ
₹22,500
23 Sept 2023
9 Jun 2023
16 Jun 2023
9 Jun 2023
15 Jun 2023
9 Jun 2023
Amount
Revetment of foundation of location No. 12 of 132 KV Rewa Road-Koraon D/C Line Under ETD-III,Prayagraj. The job includes the following works:-
Cost of Excavation of earth including all earth work, backfilling and levelling.
Cost of Concrete with 40mm alone ballast, coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc.required for proper completion of work satisfactorily.
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of of soil to obtained by the contractor from out side including watering, ramming and dressing of earth etc.complete including the cost of earth, royalty, taxes etc.and cost of material ,labour and T&P required for proper completion of work satisfactorily.
12 mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material ,labour and T&P etc.required for proper completion of work satisfactorily
Making weep holes providing plastic pipe of length 3.0 mtr (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0 mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revettement wall) (01 Job for each location)
Revetment of foundation of location No. 19 of 132 KV Rewa Road-Koraon D/C Line Under ETD-III,Prayagraj. The job includes the following works:-
Cost of Excavation of earth including all earth work, backfilling and levelling.
Cost of Concrete with 40mm alone ballast, coarse sand and cement mortar in ratio 1:4:8 in foundation under floor including the cost of all material labour and T&P etc.required for proper completion of work satisfactorily.
Cost of concreting for CC top cover on retaining wall of tower including cost of cement etc. with 1:2:4 concrete.
1st class brick work for the construction of retaining wall in 1:4 ratio cement, mortar including the cost of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of of soil to obtained by the contractor from out side including watering, ramming and dressing of earth etc.complete including the cost of earth, royalty, taxes etc.and cost of material ,labour and T&P required for proper completion of work satisfactorily.
12 mm plaster work on the wall cement and sand in ratio 1:4 including the cost of material ,labour and T&P etc.required for proper completion of work satisfactorily
Making weep holes providing plastic pipe of length 3.0 mtr (cost including the cost of plastic pipe including cutting in accordance size and fitting them in two layers at the span of 2.0 mtr at depth of 0.5mtr, 1.25mtr and 2.0mtr respectively from the top of the revettement wall) (01 Job for each location)
Shailesh Kumar Mishra
BARKATI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .