| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹2.5 Cr+₹10.8 L (4.58%)Rejected-Finance | ₹2.5 Cr+₹10.8 L (4.58%) | L2 | Rejected-Finance Rejected by Project level Evaluation Committee |
| 3 | L3₹2.5 Cr+₹17.7 L (7.53%)Rejected-Finance | ₹2.5 Cr+₹17.7 L (7.53%) | L3 | Rejected-Finance Rejected by Project level Evaluation Committee |
| 4 | L4₹2.5 Cr+₹18.6 L (7.88%)Rejected-Finance | ₹2.5 Cr+₹18.6 L (7.88%) | L4 | Rejected-Finance Rejected by Project level Evaluation Committee |
| 5 | L5₹2.6 Cr+₹19.4 L (8.23%)Rejected-Finance WARD NO 3 PO PATIA PS BHUBANESWAR MC KHURDHA 751031 | BHUBANESWAR | KHURDHA | ODISHA | 751031 | ₹2.6 Cr+₹19.4 L (8.23%) | L5 | Rejected-Finance Rejected by Project level Evaluation Committee |
Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
13 Mar 2026, 5:00 pmClosed
Chief Construction Engineer
Office of the Chief Construction Engineer, Brutang and Hadua Irrigation Project, Dasapalla
Construction of D-type Quater (Block-A) of Brutanga and Hadua Irrigation Project, at-Dasapalla Irrigation Colony District Nayagarh. (Civil, PH and Electrical)
2026_CCEBH_126081_1
Bid Identification No-CCE-BHIP-BID-05(05)/2025-26 Dt.11 .02.2026
National Competitive Bid
Civil Works - Bridges
Percentage
330 days
Dasapalla
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.2 L
Yes
14 Jul 2026
20 Feb 2026
16 Mar 2026
20 Feb 2026
13 Mar 2026
20 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum stoney earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and leveling the bed upto the required depth and depositing the excavated materials away from the work site with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | 679.45 | Cum | 276.9 | ₹1,88,139.71 |
| 2 | Supplying, Diluting & Spreading Chemical Emulsion like CHLORPYRIPHOS OR Other Chemical approved by the Central Insecticides Board as directed by the manufacturer and spraying the mixture uniformly by the sprayer as preconstructional antitermite treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 litres (or as directed by the manufacturer) per sqm on vertical and 5.0 litres per sqm on horizontal surfaces, 50% of the emulsion to be filled in center to center etc. complete as per the holes made in trenches at 150m.m IS:6313/1981(Part-II) complete including cost, conveyance, loading, unloading and taxes of all materials, cost of all labour, T&P, sundries and scaffolding where required for the work etc. as directed by the Engineer -in -charge. | 483.29 | Sqm | 104.5 | ₹50,503.81 |
| 3 | Filling in foundation trenches and plinth with excavated earth well watered and rammed in layers not exceeding 23 c.m in depth including all lead and lift, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer- in- charge. | 224.22 | Cum | 184.6 | ₹41,391.01 |
| 4 | Supplying & Filling foundation trenches , plinth & ditches with river sand well watered and rammed in layers not exceeding 23 c.m in depth with all lead and lift including cost, conveyance, loading, unloading, stacking,royalties and taxes of all Materials, cost of all Labour,Sundries, T&P required for the work etc. complete in all respect as directed by the Engineer- in -charge. (Measurement will be taken on finished compacted section only.) | 161.12 | Cum | 916.4 | ₹1,47,650.37 |
| 5 | Providing and Laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors (i.e. below the base course of the flooring) using 40 mm size crusher broken H.G Stone Metal free from weathered skins , cement and screened & washed sharp river sand for mortar of approved quality & from approved quarry including hoisting, lowering and laying concrete to the required level, ramming, watering & curing etc complete to required levels, laid in layers not exceeeding 15cm thick in each layer including cost, conveyance , loading,unloading, stacking ,royalties and taxes of all materials, cost of all labour, Sundries, T&P required for the work including shoring, shuttering and dewatering ( if required) including hire and running charges of the water pump required for the work etc complete in all respect as directed by the Engineer-in-charge. | 121.07 | Cum | 5,865.2 | ₹7,10,099.76 |
| 6 | Providing Fly Ash Brick Masonry using bricks of size 25 c.m. x 12 c.m. x 8 c.m. having crushing strength not less than 75 kg per square c.m. in cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in the works in Foundation & Plinth of works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | 80.39 | Cum | 5,688.5 | ₹4,57,298.52 |
| 7 | Providing Fly Ash Brick Masonry using bricks of size 25 c.m. x 12 c.m. x 8 c.m. having crushing strength not less than 75 kg per square c.m. in cement mortar of mix (1:6) with cement and screened & washed sharp sand for mortar after immersing the bricks for 6 (Six) hours in water before use in the works in superstructure and similar such type of works with all necessary projections, splays cutting, circular moulding, corbelling, chamfering, watering and curing etc. including cost, coveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,scaffolding, sundries and T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | - | - | - | - |
| 8 | Ground Floor | 33.75 | Cum | 5,721.8 | ₹1,93,110.75 |
| 9 | First Floor | 153.4 | Cum | 6,100.2 | ₹9,35,770.68 |
| 10 | Second Floor | 153.4 | Cum | 6,535.1 | ₹10,02,484.34 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.45 MB
dtcnfinal.pdf
Tender Documents • 25.77 MB
BOQ_581313.xls
BOQ • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .