| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹37 L+₹11.2 L (43.4%)Rejected-AOC 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L2 | Rejected-AOC L2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Not enlisted in appropriate cat d(iv) | |
| 4 | Rejected-Technical 275 2 AJIT NAGAR UPPER GADIGARH AIR PORT ROAD JAMMU INDEX NO D 04 ADGNJ | JAMMU | JAMMU AND KASHMIR | 180001 | - | Rejected-Technical Not enlisted in appropriate cat b(i) and d(iv) | |
| 5 | Rejected-Technical H NO 177 GOVINDPURA SATWARI JAMMU CANTT 180003 J K | JAMMU | JAMMU AND KASHMIR | 180003 | - | Rejected-Technical Not enlisted in appropriate cat b(i) and d(iv) |
Tender Value
Refer Docs
EMD Value
₹50,300
Closing Date
22 Sept 2021, 6:00 pmClosed
GE I RND Delhi
MILITARY ENGINEER SERVICES, GARRISON ENGINEER (I) RND, LUCKNOW ROAD, TIMARPUR, DELHI-110054
REPAIR/MAINTENANCE OF METERING AND PROTECTION SYSTEM FOR HT/LT PANEL INCLUDING DG AMF FOR REAL TIME MONITORING AND ALLIED WORKS IN RESPECT OF ENERGY AUDIT AT DRDE GWALIOR UNDER GE I RND DELHI
2021_MES_470314_1
GE/RND-51/GWL/2021-2022
Open Tender
Civil Works
Item Rate
180 days
Gwalior
Class- D, Cat- b(i) and d(iv)
2 documents required · 2 mandatory
₹500
GE I RND Delhi
₹50,300
Yes
13 Oct 2021
24 Aug 2021
24 Sept 2021
24 Aug 2021
22 Sept 2021
10 Sept 2021
Amount
Maintenance & complete overhauling of 33 KV SF6 Breaker & Remote Control Panel including dismantiling of operating mechanism parts well cleaning with petrol and replacing minor parts, ressembing of parts including well cleaning and complete panel board and main bus bar, de- carbonizing all joints bus bar CT, PT , Spouts metal parts and making breaker prefect operation in manual and electric mode including all routine and preventive including compete Calibration of 33 KV Transformer control and relay panel complete such as ANN-annunciator, Master trip relay, Aux external trip relay, Trip CKT supervision relay, overcurrent & earth fault relay, auxillary relays etc and setting as per site conditions and manufacturer's instruction by applying AC/DC to voltage coil unit and measuring the time taken by relay to have trip command etc including replacement of old/burnt wiring complete all as specified and directed. Note : Cost of minor spare parts deemed to be included in the quoted rates.
Dismantling of old battery bank set up & Supply , testing , commissioning DC to DC converter on line power supply unit voltage influence <0.5%/V Temperature influence .<0.01%/C Ambient conditions Ambient temperature :-25 C to +55 C Storge temperature: -25 C to +70 C Transport temperature : 25+70 C Related huminity : 15% to 85% Double Conversion On Line. Continous Voltage & Frequency Regulation. High Power Density Wide Input Voltage range = input Supply voltage 360-450 volts three phase Frequency ,AC Input 47-55 Hz Supply voltage fail. Bridging time at 100% load 10ms Min. Max deviation of output with static load change +2.5 % Max ,deviation of output with dyn. load change 5% (load change 10-90%) Short-circuit protection overcurrent switch-off with automatic restart Overload protection overtemperature and overcurrent swith-off reset after thermal overload switch-off disconnection of AC input voltage 30 s Min. Standards lsolation testing 2.5KV AC routine test overvoltage category degree of pollution Electromagnetic compatibility Input current harminics no limitation Efficiency at nom. load approx. 79-84 % Indication of operational states green LED, output voltage OK Operating temprature 0 C...+55 C Storage temperature-25 C ......+75 C User Replaceable, Batteries type SMF back up not less 01 Hr at full load of 5 KVA considering KW. Built in Automatic & Manual Bypass. Faster Time Cold Start. IGBT Based with lsolation Transformer Intelligent Battery Managment. Lightning and surge Protection Sine Wave Output Network Grade Line Conditioning Emergency Power Off Unattended Safe Graceful Shutdown Alarms and Indicators. Power Chute Software (Optional). Auto sensing and programmable Frequency suitable for 11 KV HT Breaker & VCB Panel fitted with spring charge motors and OLTC Motors and OLTC Motor units for switching on and off 11 KV breaker at the mode power failure from state electricity board Multiple output voltage (a) 110 Volts DC (+or-) 0.5% 10 A accuracy, (b) 400 volts AC (+or-) 0.5% 3 Phase 10 A accuracy, & 220 Volts AC (+or-)0.5% 10 A for motor unit of SF6 Breaker & OLTC accuracy with load sustaining capacity. EHT 33 KV & HT 11 KV breakers spring charge motors Overload : 110% of rated load power factor>90% with feature of suitable for existing breaker to handle tripping & Auto sensor to detect built with AND Gate software for prompt recharge in all respect either in all tripping or at the mode of power failure with standard battery slection indications Mains Emergency Over Load reverse polarity battery charging with SMPS ON/OFF switch. INPUT CABLE -NEUTRAL AND PAHASE 16 SQ MM. OUTPUT CABLE - NEUTRAL AND PAHSE 16 SQMM VOLTAGE HARMONICS <3% LINEAR BATTARY EARTH LEADS-2.5 SQMM OUTPOWER FACTOR-0.8 LAG. OUTPUT FREQUENCY - 50Hz+/-0.5% WAVE FORM-20 MILLI SEC PURE SINE WAVE RESPONSE TRANSIENT <8% ON 90% LOAD CREST FACTOR- 3:1 DISPLAY - SUPPLY ON BATTARY HIGH/LOW CHARGING ON MAINS LOW/HIGH BYPASS FAULT OVERHEAT PROTECTION-OUTPUT OVERVOLTAGE OUTPUT UNDER VOLTAGE OVERLOAD SHORT CIRCUIT OVERLOAD CAPACITY-110%-08 MIN, 125%-90 SEC, 150%-45 SEC LIQUID CRYSTAL DISPLAY INPUT VOLTAGE/FREQUENCY LOAD%CHARGEING CURRENT TRANSFER TIME/SWITCHING TME-0 MILLI SEC SWITCHIGEAR- WITHOUT ANY HUMIDITY -5% TO 95% NON CONDENCED Complete all as specified and directed.
Alarms and Alerts: The Web Based Application software and Services should generate Alarms and send Alerts over SMS messages to mobile user and emails for the conditions such as : . Voltage in any phase goes above specified limit with value of voltage . Voltage in any phase goes below specified limit with value of power factor . Power factor of any phase is less than 0.85 with value of active factor . Any deviation from benchmark value of active power apparent power and reactive power . Incoming power supply not available. Ability to suppress the alert during specified time period in a day. Note SMS to user should be strictly through Central Server (CS) and No user shall be able to recevie SMS directly from the Intelligent Field Device due to security concerns. SMS must be delivered to client up to 05 years from date of instalation Key Technology creteria . The system should be accessible anywhere through web but with a secured password protection and no software or hardware required to be installation for viewing the data on web .The software and server should be maintained by the contractor, without cost implication and there should not be any requirment of deploying IT hardware and software . The web application shall be hosted on Tier-III certified data center
Dismantling of old burnt damaged Inter connection transformer in existing AMF panel set up of capacity 160 KVA 3 Phase, supply, installation, testing & commissioning micro processor card two sources suitable for 3 phase supply delta connected auto transformer which can step up & step down for synchronization of two diffrent sources of supply one DG set & Second of commercial with bi-directional command Also provided with sensor synchronised with the power supply for providing a circulating path for the zero- sequence currents with ratio 0.336/0.578 & 0.875 complete all as specified and directed.
Dismantling of old protection unserviceable relay & supply, installation, testing & commissioning Automatic Frequency display & micro programmer protection device 3 phase (88-264) Volts unit (45 Hz- 55 Hz) Adj Cut off Operatig voltage etc as required. INPUT Voltage with P.T.- 25 KV -40 KV 40 Hz To 60 Hz b. INPUT Power FACTOR -0.9 INPUT CABLE -1.5Q MM. OUTPUT CABLE 1.5Q MM. EARTH LEAD- 2.5 Q MM OUTPUT POWER FACTOR -0.8 LAG.h) DISPLAY -REALY ON MAINS LOW/HIGH , BYEPASS FAULT , OVERHEAT I) PROTECTION-INPUT FREQUENCY MUST BE SINE WAVE OTHERWISE TRIPPING J) OVERVOLTAGE CAPACITY -110%-08MIN, 125% -45 SEC . LIQUID CRYSTAL DISPLAY - INPUT VOLTAGE/FREQUENCY, LOAD % OPERATION TIME -05 MILLI SEC I. HUMIDITY -5% TO 95% NON CONDENCED m. TRIPPING - INSTANT IN CASE OF FREQUENCY DROPS BELOW 45 Hz WITH INSTANT ALARM UP 05 METER RANGE AUDIBLE AND AFTER 05 MINUTES ON DELAY TRIPPING OF 33 KV SF6 BREAKER Complete all as specified and directed.
Note for item No 2.00 to 7.00 :- (i) The entire work shall be executed by OEM only approved by Accepting Officer. (ii) The contractor shall be submitted original purchase vouchers, test certificate and guarantee certificate from OEM for scrutinized/approval of GE(I)/Engr-in-Charge before execution/installation of item at site. (iii) The contractor shall also be furnished written guarantee on his letter pad to the GE(I) after completion of work. The contractor shall also be ensured post audit of work from MES enlisted Energy Auditor and completion of work will only be issued after above audit. (iv) The rates for the above requirements shall also deemed to be included in the quoted rates and no extra claim will be entertained.
M/S Sonu Traders
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .