Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.4 LAccepted-AOC | ₹16.4 L | L1 | Accepted-AOC L1 is the lowest bidder |
| 2 | L2₹17.2 L+₹78,943.63 (4.81%)Rejected-AOC SERAIKELLA WARD NO 08 NEAR PATI CHOWK DIST SERAIKELLA KHARSAWAN | SERAIKELLA | SERAIKELLA KHARSAWAN | JHARKHAND | ₹17.2 L+₹78,943.63 (4.81%) | L2 | Rejected-AOC L1 is the lowest bidder |
Tender Value
₹18.7 L
EMD Value
₹38,000
Closing Date
23 May 2026, 3:00 pmClosed
EXECUTIVE ENGINEER
MINOR IRRIGATION DIVISION SERAIKELLA
of Drain (900 ft) at Govind Vidyalaya Tamuliya-Kapali Main Road Under Chandil Block
2026_WRD_114131_1
03/WRD/MID/SER/F2/2026-2027
Open Tender
Civil Works
Percentage
180 days
CHANDIL
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹38,000
Yes
16 Sept 2026
16 May 2026
25 May 2026
16 May 2026
23 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in
ordinary soil (vide classification of soil item- A) and
disposal of excavated soil as obtained to a distance
upto 50 mtrs. Including all lifts levelling ramming the
foundation trenches removing root of trees shrubs all
complete as per approved design building specification
and direction of E/i | - | M3 | 167.3 | - |
| - | providing coarse clean sand filling in foundation
trenches or in plinth including ramming and watering in
layers not exceeding 150 mm. thick with all leads
including cost of materials, labour, royalty and taxes all
complete as per building specification and direction of
E/I | 1 | M3 | 589.51 | ₹588.92 |
| - | Providing designation 75B Brick flat solling joints with
local sand including cost of watering taxes and royalty
all comlete as per building specification and direction
of E/I. | 1 | M2 | 330.34 | ₹330.01 |
| - | Provinding and laying in position specified grade of
reinforcement cement concrete all work up to plinth
level but excluding of reinforcement, centering,
shuttering and finishing as per building specification
and direction of E/I. | 1 | M3 | 5,218 | ₹5,212.78 |
| - | providing centering, shuttering including strutting,
propping etc. and removal of form for foundations,
footing, base of coloumn etc. all complete as per
building specification and direction of E/I. | 1 | M2 | 194.5 | ₹194.31 |
| - | roviding M.S. Steel reinforcement of 8 mm to 10 mm
dia M.S. bars as per approved design and drawing
including carriage of M.S. bars to work site cutting,
bending, and binding with annealed wire cost of wire
removal of rust placing the rods in position all complete
as per specification and direction of E/i | - | mt | 82,096.54 | - |
| - | Carriage of material(i)Cement | - | MT | 502.6 | - |
| - | (ii)sand | - | M3 | 956.92 | - |
| - | (iii)stone chips | - | M3 | 446.68 | - |
| - | (iv) brick | - | M3 | 699 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
sop.pdf
Additional Documents • 4.27 MB
td.pdf
Tender Documents • 1.43 MB
BOQ_154153.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .