Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹11,900
Closing Date
23 Mar 2026, 11:30 amClosed
Commissioner
Thirunallar Commune Panchayat
Improvements to the Kuyavar burial ground along Karukkankudy road.
2026_DLA_22065_1
30/TNRCP/e-Tenders/2025-26
Open Tender
Road Works
Percentage
180 days
Thirunallar
Please refer Tender documents.
3 documents required · 3 mandatory
₹525
Yes
₹11,900
Yes
17 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
23 Mar 2026
14 Mar 2026
Code No.2.28.1 Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil
Code No.2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil
Code No.2.27 Supplying and filling in plinth with river sand under floors, including watering ,ramming consolidating and dressing complete
Code No.4.1.10 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size).
Code No.5.9.1 Centering and shuttering including strutting , propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete.
Code No.4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size)
NSR 60 Providing and Laying of Unscreened gravel boulders including conveyance of unscreened gravel boulders to work site from approved quarry and stacking to the departmental gauge for pre measurement, spreading hand packing to the required camber and gradient, watering and consolidation by power roller rolling all as directed by the Engineer - in - Chagre. The rate shall include cost of Unscreened gravel boulders and water, labour charges for stacking, spreading hand packing and watering, hire and fuel charges for power roller and all other tools and plants employed etc., Complete the Volume of stacks calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quanity
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tendernotice_2.pdf
PDF • 2.15 MB
BOQ_22520.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .