| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹1.8 Cr+₹8.7 L (5.01%)Rejected-Finance | ₹1.8 Cr+₹8.7 L (5.01%) | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | T.Chinnaramasivan L2 | M Shanmugavelu L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 736 | Cum | 194.15 ₹1,42,894.4 | 184.88 ₹1,36,071.68 Lowest |
| 2.00 | Plain cement concrete Using 1:4:8 mix ( One cement , four M- Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 148 | Cum | 5,850.71 ₹8,65,905.08 | 5,571.54 ₹8,24,587.92 Lowest |
| 3.00 | Supplying and erecting steel centering for sides and soffits of all PCC Works Such as Retaining Wall, Drain sides etc including supports and Minimum strutting for plain surface using MS Sheet with necessary L angles for frames complete as per standard specification - 10m2 as per TNDSS & Morth specification No:30 & 36 | 3,922 | Sqm | 482.9 ₹18,93,933.8 | 459.85 ₹18,03,531.7 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 491 | Cum | 7,373.1 ₹36,20,192.1 | 7,021.3 ₹34,47,458.3 Lowest |
| 5.00 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M.Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 491 | Sqm | 178.76 ₹87,771.16 | 170.23 ₹83,582.93 Lowest |
| 6.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 1,013 | Cum | 2,397.57 ₹24,28,738.41 | 2,283.17 ₹23,12,851.21 Lowest |
| 7.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 676 | Cum | 2,679.6 ₹18,11,409.6 | 2,551.74 ₹17,24,976.24 Lowest |
| 8.00 | Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 6,751 | Sqm | 86.73 ₹5,85,514.23 | 82.59 ₹5,57,565.09 Lowest |
| 9.00 | Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 6,751 | Sqm | 20.16 ₹1,36,100.16 | 19.2 ₹1,29,619.2 Lowest |
| 10.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 338 | Cum | 11,444.16 ₹38,68,126.08 | 10,898.11 ₹36,83,561.18 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
29 May 2025, 3:00 pmClosed
Executive Officer
Executive officer vadakarai Keelpidagai Town Panchayat
Formation of BT road with drainage at Munusuli road east part 2nd east west street 5th south north street,anna nagar main road cresent nagar 1 to 6 street,kottai thiradu burial ground road,K M street sangali madan kovil back side south north side sou
2025_DTP_559822_1
56/2025/1
Open Tender
Civil Works - Roads
Works
Formation of BT road with drainage
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
Yes
Vadakarai Keelpidagai Town Panchayat office
4 Oct 2025
20 May 2025
29 May 2025
20 May 2025
29 May 2025
20 May 2025
22 May 2025
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications.
Plain cement concrete Using 1:4:8 mix ( One cement , four M- Sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and erecting steel centering for sides and soffits of all PCC Works Such as Retaining Wall, Drain sides etc including supports and Minimum strutting for plain surface using MS Sheet with necessary L angles for frames complete as per standard specification - 10m2 as per TNDSS & Morth specification No:30 & 36
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M.Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and Laying of Hot Applied Thermo Plastic Compound 2.5 mm Thick Inculding Reflectorising Glass Beads @250 GmsPer Sqm area, Thickness of 2.5mm Exculsive of Surface applied Glass Beads as per IRC 35 The Funished Surface to be Level Uniform and Free From Streaks and Holes etc Complete
T.Chinnaramasivan (BID ID -1352528)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .