Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | H1₹5.7 CrAdmitted-Finance | -5.65% | ₹5.7 Cr | H1 | Admitted-Finance |
| 2 | H2₹5.7 Cr−₹2.6 L (0.45%)Admitted-Finance | -6.07% | ₹5.7 Cr−₹2.6 L (0.45%) | H2 | Admitted-Finance |
| 3 | H3₹5.6 Cr−₹17.6 L (3.06%)Admitted-Finance | -8.54% | ₹5.6 Cr−₹17.6 L (3.06%) | H3 | Admitted-Finance |
| 4 | H4₹5.4 Cr−₹32.9 L (5.74%)Admitted-Finance | -11.07% | ₹5.4 Cr−₹32.9 L (5.74%) | H4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹6.1 Cr
EMD Value
₹12.1 L
Closing Date
1 Apr 2026, 6:00 pmClosed
EE KSL Dn IGNP Loonkaransar
EE KSL Dn IGNP Loonkaransar
Construction of damage lined water course in DOL 314.245L, 346.900R, 355.100L, 355.500R, 362.000L
2026_IGNP_543223_9
EEKSL07 of 2025-26
Open Tender
Civil Works
Percentage
365 days
Loonkaransar
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
EE KSL Dn IGNP Loonkaransar
₹12.1 L
Yes
SE Sahwa Circle Bikaner
24 Apr 2026
28 Feb 2026
2 Apr 2026
28 Feb 2026
1 Apr 2026
28 Feb 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1JUNGLE CUTTING AND CLEARANCE | |||||
| 1.01 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. | 32,069.72 | Sqm | 2.5 | ₹80,174.3 |
| 2EARTH WORK | |||||
| 2.01 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in Soft/Loose soil | 42,880.36 | Cum | 92 | ₹39,44,993.12 |
| 2.02 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) | 42,880.36 | Cum | 25 | ₹10,72,009 |
| 3LINING | |||||
| 3.01 | Watering, ramming & dressing of sub grade including removal of irregularities upto 15 cm depth | 24,356.1 | 10 Sqm | 95 | ₹23,13,829.5 |
| 3.02 | PCC block brick masonry (using PCC bricks of size 230 x 110 x 70 mm, using Cement Concrete of nominal mix 1:3:6 as per specification) up to plinth including all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5 | 4,072.81 | Cum | 9,116 | ₹3,71,27,735.96 |
| 3.03 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing and curing all leads of construction materials of thickness 10 mm | 41,366.72 | Sqm | 185 | ₹76,52,843.2 |
| 4PUCCA STRUCTURES | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
Bidwork9P28.pdf
Tender Documents • 6.48 MB
BOQ_968481.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .