Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC PLOT NO 13 II ND CROSS STREET RAMESH NAGAR VALASARAVAKKAM CHENNAI 600 087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | ₹12.6 L Quoted ₹12.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.8 LRejected-Finance | ₹13.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K S CONSTRUCTION L1 | H.Venkateswaran L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for paying out of 3 Nos. Zebra conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including sorting out of conductor according to drum schedule and loading and unloading at site, cost of T&P lead and lift etc., complete. | 0.1 | Km | 75,000 ₹7,500 | 2,00,000 ₹20,000 |
| 2.00 | Labour charges for rough sagging, tensioning, clipping, jumpeing for 3 nos. Zebra conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including providing trussels cost of T&P lead and lift etc., complete. Under LC Condition | 1 | Span | 70,000 ₹70,000 | 60,000 ₹60,000 |
| 3.00 | Labour charges for lowering of LT/HT line during stringing of power conductor and restringing to the orginal position after completion of stringing work and devoulted to store including cost of all labour transport, lead, lift, etc., complete as directed by the department engineer at site. | 4 | Nos. | 5,500 ₹22,000 | 2,000 ₹8,000 |
| 4.00 | Mobilization of Gang along with the vechicle for erection and gas welding for erection of Cross arm for execution of LC work to be carried out for bay swapping including Transportation, lead, lift, labour, etc., complete as directed by the engineer at site. | 5 | Days | 20,000 ₹1 L | 10,000 ₹50,000 |
| 5.00 | Labour charges for removing of loop jumpering and re strining of loop jumpering including cost of loading and unloading, transporting, etc complete(Under LC Condition) | 1 | Span | 36,000 ₹36,000 | 10,000 ₹10,000 |
| 6.00 | Labour charges for 230KV side gantry dropper work including cost of loading and unloading, transporting, etc complete(Under LC Condition) | 18 | Nos. | 3,000 ₹54,000 | 7,000 ₹1.3 L |
| 7.00 | Providing 70 KV DG set for backup power at Alamathy 400/230-110 KVSS station supply including cost of transporting, etc., complete. | 4 | Days | 6,500 ₹26,000 | 5,000 ₹20,000 |
| 8.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor - Single suspension fittings. | 15 | Sets. | 1,848.5 ₹27,727.50 | 3,000 ₹45,000 |
| 9.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor - Single Tension fittings. | 72 | Sets. | 2,315.47 ₹1.7 L | 3,000 ₹2.2 L |
| 10.00 | Transporting and hoisting of Polymer insulator strings and fitting including transport T&Ps all labour charges leads, lifts etc., complete excluding cost of suspension clamp assembly and insulators. (Under LC Condition) - 90 KN Insulator. | 15 | Sets. | 1,725 ₹25,875 | 1,500 ₹22,500 |
Tender Value
₹12.6 L
EMD Value
₹12,600
Closing Date
17 Feb 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_655944_1
LT-040/25-26 of SE/GCC-I/CNI
Limited
Civil Works
60 days
Alamathy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,600
Yes
16 May 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
Labour charges for paying out of 3 Nos. Zebra conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including sorting out of conductor according to drum schedule and loading and unloading at site, cost of T&P lead and lift etc., complete.
Labour charges for rough sagging, tensioning, clipping, jumpeing for 3 nos. Zebra conductor including cost of all materials, labour, tools and plants, lead and lift etc., complete including providing trussels cost of T&P lead and lift etc., complete. Under LC Condition
Labour charges for lowering of LT/HT line during stringing of power conductor and restringing to the orginal position after completion of stringing work and devoulted to store including cost of all labour transport, lead, lift, etc., complete as directed by the department engineer at site.
Mobilization of Gang along with the vechicle for erection and gas welding for erection of Cross arm for execution of LC work to be carried out for bay swapping including Transportation, lead, lift, labour, etc., complete as directed by the engineer at site.
Labour charges for removing of loop jumpering and re strining of loop jumpering including cost of loading and unloading, transporting, etc complete(Under LC Condition)
Labour charges for 230KV side gantry dropper work including cost of loading and unloading, transporting, etc complete(Under LC Condition)
Providing 70 KV DG set for backup power at Alamathy 400/230-110 KVSS station supply including cost of transporting, etc., complete.
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor - Single suspension fittings.
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor - Single Tension fittings.
Transporting and hoisting of Polymer insulator strings and fitting including transport T&Ps all labour charges leads, lifts etc., complete excluding cost of suspension clamp assembly and insulators. (Under LC Condition) - 90 KN Insulator.
Transporting and hoisting of Polymer /Antifog insulator strings and fitting including transport T&Ps all labour charges leads, lifts etc., complete excluding cost of suspension clamp assembly and insulators. (Under LC Condition) - 120 KN Imsulator.
Labour charges for Stringing of 3 nos (1 Circuits) ACSR Zebra conductor sagging tensioning to correct sag and fixing to towers as per specification and as directed by the Board Engineer at site clipping, jumpering, labour charges for fixing midspan compression joints repair sleeves wherever required and vlibrated dampers as directed by the Engineer - Single Span
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_786586.xls
BOQ • 0.29 MB
LT040.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid