Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MAIN ROAD SIDHRA JAMMU | Admitted-Finance |
| 2 | Admitted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | Admitted-Finance |
| 3 | Admitted-Finance BHAGWATI NAGAR JAMMU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
27 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
MH MORH
Rate contract for repair of motors of various ratings installed at various pumping stations of Jal Shakti (PHE) mechanical division Udhampur
2023_PHE_238129_1
ENIT NO. 131 OF 2023-24
Open Tender
Repair and Maintenance Works
Item Rate
10 days
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
Rate contract for repair of motors of various ratings installed at various pumping stations of Jal Shakti (PHE) mechanical division Udhampur
7 documents required · 7 mandatory
₹500
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
₹50,000
Yes
8 Jan 2024
24 Nov 2023
28 Dec 2023
24 Nov 2023
27 Dec 2023
24 Nov 2023
Amount
Visit of technician to the site for assessment of fault / damage
Dismounting of HC motor from its installed position by disconnecting all the incoming and outgoing power connections and disengaging the coupling pulley set.
Extraction of submersible pump set alongwith column pipes from tubewell / open well.
Manual carriage of the motor upto the nearest motorable raod side and then back to the site after
Upto 100m (to and fro)
Upto 50 HP
Upto 100 HP
Upto 150 HP
Upto 200 HP
Upto 250 HP and beyond
Upto 500m (to and fro)
Upto 50 HP
Upto 100 HP
Upto 150 HP
Upto 200 HP
Upto 250 HP and beyond
Upto 1000m (to and fro)
Upto 50 HP
Upto 100 HP
Upto 150 HP
Upto 200 HP
Upto 250 HP and beyond
Upto 2000m (to and fro)
Upto 50 HP
Upto 100 HP
Upto 150 HP
Upto 200 HP
Upto 250 HP and beyond
Loading of motor into mechanical transport using skilled labour and then carriage to the workshop and unloading at workshop and then shifting back to site after repairs and unloading there
Upto 100 km (to and fro)
Upto 200 km (to and fro)
Upto 300 Km and beyond (to and fro)
Dismantling of motor of workshop, then extraction of rotor.
Reconditioning of rotor shaft by way of welding turning and finishing as per the required size
Upto 50 HP
Upto 100 HP
Upto 150 HP
Upto 200 HP
Upto 250 HP and beyond
Complete rewinding of stator by way of cleaning of slots and rewinding with new copper wire of required guage then complete insluting and varnishing of stator (rate should be inclusive of rebate on account of copper scrap)
Slow speed (Squarrel cage Motor)
High speed (Squarrel cage Motor)
Slow speed (slipring motor)
Mono submersible motor
Submersible motor
Assembling the motor after repairs
Remounting of HC motor at its installed position and making all the power connections and testing on full load.
Lowering of submersiblepump set alongwith column pipes into the tubewell / open well and making all the connections and testng on full load
NATIONAL ELECTRO-MECH COMPANY
PERFECT ELECTRICAL WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .