Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹37.4 L
EMD Value
₹46,800
Closing Date
21 Oct 2026, 11:00 amDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 50 nos. bricks ventilation stoppings in G-III bottom seam at Bagdewa UG Mine, Korba Area.
2026_SECL_366778_1
SECL/GM/KB/SO(M)/eNIT/26-27/32 dt 08.10.26
Open Tender
Civil Works - Buildings
Item Rate
360 days
Korba
As per NIT
4 documents required · 4 mandatory
₹46,800
9 Oct 2026
9 Oct 2026
22 Oct 2026
9 Oct 2026
21 Oct 2026
10 Oct 2026
9 Oct 2026 - 14 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 28.5 | Cubic Meter | 6,981.72 | ₹1,98,979.02 |
| 2 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 24 | Cubic Meter | 2,480.95 | ₹59,542.8 |
| 3 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 90 | Cubic Meter | 775.18 | ₹69,766.2 |
| 4 | Loading of material (Cement) into tub on surface within a lead of 50m. | 20.71 | Metric Tonnes | 230.48 | ₹4,773.24 |
| 5 | Loading of material (Sand) into tub on surface within a lead of 50m. | 84.48 | Cubic Meter | 397.81 | ₹33,606.99 |
| 6 | Loading of material (Bricks) into tub on surface within a lead of 50m. | 133.25 | Thousand | 742.46 | ₹98,932.8 |
| 7 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 20.71 | Metric Tonnes | 209.17 | ₹4,331.91 |
| 8 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 84.48 | Cubic Meter | 361.04 | ₹30,500.66 |
| 9 | Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 133.25 | Thousand | 673.84 | ₹89,789.18 |
| 10 | Brick work with flyash F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand). DSR Item no. 6.1.2 | 157 | Cubic Meter | 7,079 | ₹11,11,403 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.42 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.76 MB
BOQ_379713.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .