Tender Value
₹7.1 L
EMD Value
₹7,140
Closing Date
24 Oct 2024, 4:00 pmClosed
BDO(VP) Karungulam
KGLM UNION OFFICE
Construction of Crematin Shed and approach road at Lakshmipuram Village in Poovani panchayat in Karungulam Union Under ITPHD 2024-25 Package No.01
2024_RDTN_494968_1
BDO(VP)KGLM Lr.No.T1/1397/2024 tender date.24.10.2024
Open Tender
Civil Works
Works
Karungulam union office Seydunganallur
As per tender Document
3 documents required · 3 mandatory
₹0
₹7,140
Yes
19 Jun 2025
19 Oct 2024
24 Oct 2024
19 Oct 2024
24 Oct 2024
19 Oct 2024
Amount
:Construction of Cremation Shed,Compound wall approach road and Hand Pump arrangement at Ambedhkar Nagar in Vallakulam Panchayat in Karungulam Panchayat Union of Thoothukudi District under ITHPD 2024-25.Package No:01
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling the basement with excavated earth other than sand complying the Standard specification
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound
Emulsion painting two coats including cost and conveyance of all materials to site and labour charges etc complete.
Cement Concrete in 1 : 2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Earth work Excavation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting, Sectioning the street to lay concrete pavement per SS 20 B
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for base course below Wearing course to Street.
Centering sides and soffits for all PCC works including cost and conveyance of all materials to work site from approved quarry including cost of cement which will be supplied departmentally including all labour for mixing, laying, compactiong, watering wherever necessary and laid in layers of not more than 15cm thick., etc., complete complying with standard specifications and as directed. - for Wearing course to Street.
Cement concrete 1 : 3 : 6 mix using 20mm HBG metal for all PCC works including cost and conveyance and all labour charges etc.complete
Cement Concrete in 1 : 2:4 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MR. BONIFACE,CONTRACTOR (BID ID -1171793)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588091.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .