Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹80.1 LAdmitted-Finance | H1 | Admitted-Finance | |
| 2 | H2₹74.1 L−₹6.0 L (7.51%)Admitted-Finance | H2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SAMADHIYA ENTERPRISES H1 | VIJAY ELECTRICAL H2 |
|---|---|---|---|---|---|
| 1.00Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms. Decentralized Material | |||||
| 1.01 | 11 KV V-Type Cross Arm Holding Clamp | 63 | No | 135.7 ₹8,549.1 | 122.81 ₹7,736.94 Lowest |
| 1.02 | Dropper Channel (100x50x2028 mm) | 63 | No | 2,035.5 ₹1,28,236.5 | 945.83 ₹59,587.23 Lowest |
| 1.03 | Coper L-Piece 50*225*10mm (LS) | 114 | No | 1,390.93 ₹1,58,565.45 Lowest | 1,390.93 ₹1,58,565.45 Lowest |
| 1.04 | 4 Core LT MCCB With box | 50 | No | 33,925 ₹16,96,250 | 25,299.91 ₹12,64,995.4 Lowest |
| 1.05 | Al Lug Long Barrel, off size (LS) | 1,368 | No | 67.85 ₹92,818.8 | 63.24 ₹86,507.12 Lowest |
| 1.06 | Holding Clamp for Top Channel. TPMO & Fuse Set etc with Bolts and Nuts | 378 | No | 271.4 ₹1,02,589.2 | 244.94 ₹92,586.75 Lowest |
| 1.07 | Base Angle (75x75x6x2028 mm) with Clamp & Bolts and Nuts | 126 | No | 2,306.9 ₹2,90,669.4 | 2,249.39 ₹2,83,423.18 Lowest |
| 1.08 | Top Channel (125x65x2240 mm) | 63 | No | 1,085.6 ₹68,392.8 | 1,051.67 ₹66,255.52 Lowest |
| 1.09 | Concreting of Pole | 126 | No | 1,221.3 ₹1,53,883.8 | 1,082.89 ₹1,36,443.64 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Apr 2024, 12:00 pmClosed
SE EDC FIROZABAD
SE EDC FIROZABAD
for the work of increase capacity of distribution transformers above 100 KVA and 10/16KVA to 25KVA on semi turnkey basis (business Plan 2024-25) under the electricity distribution division Firozabad, Shikohabad, Jasrana, Sirsaganj and Tundla.
2024_DVVNL_922611_1
EDC/F/T-82 (2023-24)
Open Tender
Electrical Works
Lump-sum
120 days
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
DVVNL AGRA
₹1.4 L
Yes
26 May 2024
20 Apr 2024
27 Apr 2024
20 Apr 2024
27 Apr 2024
20 Apr 2024
Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms. Decentralized Material
11 KV V-Type Cross Arm Holding Clamp
Dropper Channel (100x50x2028 mm)
Coper L-Piece 50*225*10mm (LS)
4 Core LT MCCB With box
Al Lug Long Barrel, off size (LS)
Holding Clamp for Top Channel. TPMO & Fuse Set etc with Bolts and Nuts
Base Angle (75x75x6x2028 mm) with Clamp & Bolts and Nuts
Top Channel (125x65x2240 mm)
Concreting of Pole
T-off Channel (125x65x1300 mm)
Chemical Earthing
GI Strip patti for the connecting of T/F
Plinth
Fancing
Centralized Material
8.5 Mtr. PCC Pole
3x95 Sqmm. ABC
ACSR Weasel Conductor
11/0.4 KV 25 KVA Transformer
11/0.4 KV 250 KVA Transformer
11 KV TPMO with Polymer Insulator
11 KV 45 KN DISC Insulator Polymeric
11 KV V-Type Cross Arm
Polymeric 11 KV Pin Insulator
11 KV Fuse Set
Stay Set Complete
Earthing Complete
VIJAY ELECTRICAL
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .