| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.5 L+₹2.2 L (41.6%)Rejected-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.6 L+₹2.3 L (44.3%)Rejected-Finance CHINCHURIA MORE P O BAHULA DIST PASCHIM BARDHAMAN PIN 713322 W B | BAHULA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | L3 | Rejected-Finance L3 |
Tender Value
₹6.7 L
EMD Value
₹8,400
Closing Date
6 Mar 2024, 5:00 pmClosed
The General Manager
Office of the General Manager, Satgram-Sripur Area
Installation of 3 phase 3.3 KV HT overhead line from J.K. Nagar colliery substation to officer colony transformer room comes under J.K.Nagar R Colliery.
2024_ECL_302668_1
ECL/SSA/GM/E M/E-NIT/2023-24/ 401 Date 22.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Satgram Sripur Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,400
8 May 2025
26 Feb 2024
8 Mar 2024
26 Feb 2024
6 Mar 2024
26 Feb 2024
26 Feb 2024 - 28 Feb 2024
Amount
Item description
Supply & erection of 8/9 mtr. PCC pole.(With 10% Profit)
Supply fabrication, hoisting & erection of phase and earth bracket & Painting with red oxide primer.(With 10% Profit)
Supply & erection of nuts, bolts, flats and erection of clamps.(With 10% Profit)
Supply & installation of 11KV disc insulator & hardware.(With 10% Profit)
Supply & installation of 11KV pin insulator & hardware.(With 10% Profit)
Supply & fixing of 7/14 GI wire earth continuity & 6/8 SWG for making & erection of cradle guard.(With 10% Profit)
Supply & erection of HT stay set complete.(With 10% Profit)
Supply of ACSR conductor(With 10% Profit)
Tree trimming of main line.(With 10% Profit)
Outdoor type end termination of 11KV grade 3 core 70 sq. mm Copper cable, heat sinking type cable jointing kit cu lugs & other consumable materials with bolts & nuts.(With 10% Profit)
Indoor type end termination of 11KV grade 3 core 185 sq. mm cu cable, heat sinking type cable jointing kit copper lugs & other consumable materials with bolts & nuts.(With 10% Profit)
Total impact of GST for the purpose of CTC
BANERJEE CONCERN
PINAK RANJAN SADHU
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_313540.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .