| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC ANWALKHEDA MR | CHHINDWARA | MADHYA PRADESH | 460663 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.6 L+₹45,484.24 (8.90%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹6.2 L
EMD Value
₹12,000
Closing Date
23 Nov 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
ID, Firozabad
Reconstruction of damaged VRB at km 2.35 of Fatehpur minor
2023_UPIDC_855140_14
05/EE/2023-24
Open Tender
Civil Works
Item Wise
45 days
Reconstruction of damaged VRB at km 2.35 of Fatehp
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹12,000
6 Mar 2024
18 Nov 2023
23 Nov 2023
18 Nov 2023
23 Nov 2023
18 Nov 2023
Amount
Eartwork in filling for making or removing bundha in all types of soil ,proper dressing & compaction including initial lift and lead i/c all cost of labour,T&P etc.
Dismentelling work of old structure including cost of all labour, T&P etc. and proper disposal of material with distance of 60m or as directed by Engineer-in-charge for proper completion of work.
Earth work in excavation of foundation in all types of soil with initial lead & lift i/c all cost of labour,T&P etc.
C.C. 1:3:6 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:6:12 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
Ist class brick work in 1:4 in cement mortar including all cost of labour ,materials ,T&P etc.for proper completion of work.
CC.1:1½:3 with stone ballast in R.C.C. work including all costof labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:2:4 in ordinary work including all costof labour ,materials ,T&P etc.for proper completion of work.
Centering & shuttering for R.C.C including all cost of labour ,T&P etc.for proper completion of work.
Reinforcement of R.C.C. work including all cost of labour ,materials & T&P etc.for proper completion of work.
stuck deep cement pointing with 1:2 cement mortar including all cost of labour ,materials & T&P etc.for proper completion of work.
12 mm thick cement plaster with 1:4 cement mortar including all costof labour ,materials ,T&P etc.for proper completion of work.
Finishing Walls with Acrylic Smooth exterior paint (Apex) of required shade :New work(Two or more coat applied @1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
Earth work in strengthning of damage bank including proper ramming and dressing with lead up to 1km & lift upto 1.5m including all cost of labour ,T&P etc.
supplying & fixing Thermocoal in joints i/c all cost of labour ,materials and T&P etc.
Making & fixing M.S. sign board size (1250mm x 900mm) 2400 mm height with painting and writing letters i/c all cost of labour ,materials and T&P etc.
P/F of R.C.C. Wheel Guard(size of 150mmx200mmx750mm)
PADAM SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .