| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.5 LAccepted-AOC RUDRANAGAR P S SAGAR 24 PARGANAS SOUTH | L1 | Accepted-AOC L1 | |
| 2 | L2₹46.9 L+₹44,564.70 (0.96%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹47.0 L+₹45,674.90 (0.98%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L3 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹93,941
Closing Date
2 Nov 2024, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla ,Kolkata
Supply and delivery of ACSR conductor, electrical accessories with painting complete including dismantling and redrawing of ACSR conductor with stay arrangement safety device etc for LTOH line at Main Mela Ground and Chemaguri under GS Mela 2025
2024_PHED_761322_3
WBPHE/EE/SMD/NIeT-40 of 2024-25
Open Tender
Electrical Work/ Equipment
Item Rate
65 days
Sagar Island
Please refer Tender documents.
6 documents required · 6 mandatory
₹93,941
26 Mar 2025
16 Oct 2024
4 Nov 2024
16 Oct 2024
2 Nov 2024
16 Oct 2024
Amount
All Quoted Rates are inclusive of GST @ 18% + CESS @ 1%
Location of Work :- Throughout main mela ground , all the road 1 to 5 from K1 bus stand to sea beach , all the link road ,along the sea beach , link road 1A , Extension of sea beach towards burning ghat (burir khal) , towards matsya samity 2 , behind of helipad to seabeach throughout road no. 6 , all the existing LTOH line etc .
Painting the arm bracket (for S.V lamp fixture) size 3.4mtr long for fitting etc after scraping and two coats of red lead paint as per direction of EIC.
Painting of arm bracket two coats of blue coat oil bound paint after scraping of approved make as per direction of the EIC
Painting the existing “D” type iron clamp and pole clamp etc and iron angle after scraping the surface by two coat of red primer paint as per direction of EIC.
Transportation of PCC pole of 8 Mtr long by hired vehicle from WBSEDCL stack Yard at Ganga Sagar to Different point of chenaguri, Gayen bazar, gangasagar main mela ground and sea beach area including loading unloading all complete as per direction.
Supply and delivery at site [weasel] ACSR conductor 6/1/2.59 as per direction
Drawing ACSR conductor [in item no.7] to the existing overhead line in vertical configuration for medium pressure line by ACSR conductor including supply binding wire, jumper, insulator etc in different places outside and inside Mela ground complex as per direction of EIC
Supply and delivery at site of the following electrical accessories:-
Pole bracket of MS angle iron 50mm x 50mm x 6mm x 1.25mtr long with arrangement of vertical configuration for 4 wire system of LT overhead line and continuous earth wire
Supply of suitable size D type iron clamp set [galvanized] with necessary nuts, bolts, washer size 3.5” dia 5” long as per direction of EIC
Supply of 3.5” x 3” porcelain shackle insulator of LTOH as per direction of EIC including loading unloading and carrying complete as per direction of the EIC
Changing of broken insulator by supplying new insulator (item no. 11 in different position as per direction of EIC.
Fitting fixing of “D” type iron clamp, pole clamp and shackle insulator size on “D” type iron clamp complete as per direction of EIC (Shackle insulator will be supplied departmentally)
Dismantling the existing damaged “D” type iron clamp, pole clamp from PCC pole in main island and other areas and damaged materials return to the departmental store at Sagar as per direction of EIC
Fitting fixing the above MS iron angle with all fitting fitted on pole clamp including supply of necessary nuts, bolts and washers as required for the above work complete as per direction of EIC.
Replacement of bolts, nuts, washer and insulator etc of the above works as requirements complete the works as per direction of EIC including supply of all materials.
Earth filling to the level of existing PCC poles and packing bricks bates by supplying required quantity by bates after earth cutting of the pole base and the PCC pole in original position complete by providing stay wire and other materials as per direction of EIC
Re-strengthening the existing PCC pole in different places after disconnection of ACSR and stay wire etc at main island and reconnection of the same of dismantling items to complete the work in original as per direction of EIC.
Redrawing the dismantled overhead line in vertical configuration for medium pressure line by ACSR conductor (single run) including supply binding wire for jumper, insulator etc in different places i.e. Road no.5, Pilgrim, Trench Latrine, Sea side etc complete as per direction of EIC (ACSR conductor will be supplied departmentally).
Withdrawing the existing PCC pole in different places at main island after dismantling LTOH accessories from the PCC pole and staging the damaged pole at Sagar Store properly as per direction of the EIC
Re-erection of the new PCC pole at different places at main island by excavation of earth of any kind of soil upto 2M depth below ground level and refitting electrical accessories [which was dismantled at the time of withdrawing in item no.5] complete as per IE rules at main mela ground
Making stay arrangement by necessary materials which will be required i.e. stay wire of required length, stay rod, clamp, chips, sand etc as per IE rules and ISS complete as per direction of EIC
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts, nuts and washer etc including supply and fitting fixing 8 SWG GI wire and restoring the surface duly rammed as per direction and inter connection with earth spike to continue running earth on the top of the PCC pole complete and testing as per satisfaction and direction of EIC.
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, safety device, binding wire from the PCC pole in different places at main island complete as per direction of EIC.
Redrawing the ACSR conductor and earth wire of the same in item no.1 by single run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at main island on existing PCC pole and testing complete as per direction of EIC [binding wire will be supplied by the agency]
Supply and fitting fixing of hexagonal type safety device 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete
Supply and drawing of continuous earth wire from pole to pole by supplying 10SWG GI wire with all necessary materials and inter connection to earth electrode as per direction of EIC and IE rules complete after dismantling the damaged earth wire
Cutting the jungle of the different type trees for maintenance all the overhead wire at Ganga Sagar Main Mela Ground in consultation with the local Panchayet as per direction of the EIC. [14KM long road approx.]
Supply, delivery and storage at site of L.T. spacer for 3 phase 4 wire system [Riverrine charges included]
Fitting fixing of the departmental and new supplied L.T. spacer on LTOH line by skilled technician including necessary scaffolding arrangement to complete the work as per direction and IE rules.
Dismantling the existing L.T. spacer from LTOH line after completion of mela by necessary tools and tackles as per dirtection including storage the same to the departmental store.
Dismantling the existing ACSR conductor by single run for medium pressure lines at different places i.e. trench, latrine, pilgrim, road no.5, link road, dhabla hut area, sea beach area at main Mela ground and outside the mela ground at G.S. Main island (after Mela) as per direction of EIC.
Arrangement of binding and proper marking the above ACSR conductor i.e. pole no, area etc complete as per direction of EIC.
Carrying charges of ACSR conductor from different places at main mela ground and outside mela ground to Sagar store and proper staging the materials at departmental store as per direction of EIC.
Making decoration of trident pole by LED chain light and as required area :-
Supply of decorative LED chain light for pole decoration on hire basis for 07-01-2025 to 16-01-2025
Supply of 2 x 2.5 sq. mm. and 1 x 1.5 sq. mm. PVC insulated single core copper wire for connection of chain light on hire basis
Supply of 2 x 4 sq. mm. and 1 x 2.5 sq. mm. PVC insulated single core copper wire for main circuit line on hire basis
Labour charges for installation of chain light arrangement for pole decoration as per direction
Dismantling the existing ACSR conductor and earth wire by single run from end pole to end pole after disconnection all jointing materials i.e. jumper, insulator, safety device binding wire from the PCC pole in all complete as per direction of EIC.
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Supply and delivery the following electrical materials at site as per direction:
Supply of 3.5” x 3” porcelain shackle insulator of LTOH as per direction of EIC.
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Supply of suitable size D type iron clamp set (galvanized) with necessary nuts bolts
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Pole bracket of MS Iron angle of 50 mm x 50 mm x 6 mm – 1.25 mtr. Long with arrangenet of vertical configuration for 4 wire system of overhead line with continuous earth wire
Between Sreedam to Chemaguri and Rickshaw stand to Laxmi bazaar
Between Choir Gheri and Chemaguri Point
Changing of broken insulator by supplying new insulator (item no. 46 ,47) in different position as per direction of EIC.
Fitting fixing of D type iron clamp set (galvanized) with necessary nuts bolts washer etc in different position as per direction.[item 49,50}
Fitting fixing the above MS iron angle with all fitting (item No. 52,53) fitted on pole clamp including supply of necessary nuts, bolts and washers as required for the above work complete as per direction of EIC.
Redrawing the ACSR conductor and earth wire with same by single wire run for medium pressure line for proper SAG and jumper connection over insulator binding and fitting the safety device as per IE rules in different places at Chemaguri point on the existing PCC pole and testing complete as per direction of the EIC (Binding wire will be supplied by the agency).
Supply and fitting of hexagonal type safety device 10SWG GI wire for LTOH line as per direction of EIC and IE rules complete.
Supply and drawing of continuous earth wire from pole to pole by supplying 10nos SWG GI wire with all necessary inter connection to earth electrode as per direction of the E.I.C.
Making earthing arrangement by supplying 5/8” earth spike of 2M long with galvanized bolts, nuts and washer etc. including supplying and fitting fixing 8nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection from earth spike to continuous running earth on the top of the PCC pole
Cutting the jungle of the different type trees for maintenance of all the the overhead wire at chemaguri point in consultation with the local Panchayet as per direction of the EIC. [14KM long road approx.]
Carrying the all unserviceable materials from works site to departmental store, Sagar including loading and unloading all complete as per direction
Providing two Electricians and four helper at site for emergency maintenance of LTOH line as per instruction for the period from 05.01.2025 to 16.01.2025. This includes the cost of tools and plants on hire basis
Providing post mortem unit at Rudranagar Hospital including power supply arrangement for Blood storage at Rudranagar Hospital, indoor unit at Rudranagar Hospital and Primary Health center at Kalibazar in connection with Ganga Sagar Mela-2025
Providing on hire basis and laying of 1100 V grade 3 ½ core 25 sq. mm. PVC Al. Ar. Cable and dismantling the same after mela
Post Mortem unit
Blood storage unit
Indoor unit
Primary Health Centre
Finishing the ends by crimping method including supply & fixing of socket, tape and jointing materials for above cable
Carrying charges of departmentally supplied power distribution board from Ganga Sagr store to work site including installation and dismantling, carryiong including storage the same after completion of the work as per direction of the EIC
Erection of steel tubular pole of overall length 6 meter on hire basis by excavation of earth of any kind of soil 1.0/1.5 mtr. Depth below ground level with proper piling at different places with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 08.01.2025
Supply on hire basis and drawing o f LT distribution line from medium pressure line by 3 ph 4 wire system as per IE rules and ISS by 16 sq. mm. to 50 sq. mm. PVC single core al. wre as per direction
Providing on hire basis 15A switch plug combined board and dismantling the same after completion of mela
Providing on hire basis 100 watt spot light and dismantling the same after completion of mela
Drawing of 150 watt LED street light fixture in different place on hire basis from 08.01.2025 to 19.01.2025 (12 days x 75 fittings per day)
Supplying and fixing 1.5 ton AC machine 5 star rated on hire basis [5 nos working] with proper sealing arrangement in window from 08-01-2025 to 19-01-2025
Carrying of 10 nos AC machine & back after works after completion of mela
Supply, delivery and fitting fixing of 50 MFD(P2) Running Capacitor.(Make-Tipcon)
Supply, delivery and fitting fixing of 4 MFD Running Capacitor.(Make-Tipcon)
Supply, delivery and fitting fixing of runner motor
Partial gas charging of 1.5 ton split type AC machine including supply of F-22 gas with leak testing complete as per direction.
Thorough servicing and overhauling of 1.5 ton/ 2 ton/ 3 ton capacity split/ tower type air conditioner machine by cleaning, oiling of the dismantled spare parts like cooling coil, blower motor, runner motor, oscillating motor, fan, condenser, capacitor etc. by supplying of chemicals, petrol, thinner etc as and where applicable and also cleaning of other spares and changing of defective spares as per entire satisfaction of the EIC
Fitting fixing of the departmentally supplied LED board for post mortem unit including carrying the same from store to work site and dismantling with storage complete after completion of mela as per direction of the EIC
Providing on hire basis earthing arrangement by earth electrode as per IE Rules and as per direction of EIC
Earthing the whole installation with 50 mm dia GI pipe as per as per IE Rules and as per direction of EIC
Fitting fixing of departmentally supplied 5 nos fire extinguisher for safety the whole system including carrying charges from Ganga Sagar store to Rudranagar Hospital and back the same after completion of mela
Temporary arrangement of water supply like 3 nos basin, toilet, etc plumbing work, water supply source from Hospital Authority concern. All the plumbing materials supplied by agency with ½ “ GI pipe [H] , 20nos CI/ G.I. bib cock, PVC cistern[2nos]
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nail etc as per direction of the EIC only for personnel [not for DG set]
Supply and fitting fixing salbollah on hire basis as per direction of EIC.
Drawing of Tube Light at different points as per direction of EIC from 08-01-2025 to 19-01-2025=12 days x 65 pts
Making barricade of hogla 70 ft length x 6 ft height
Guarding arrangement of the whole installation round the clock from 05-01-2025 to 19-01-2025
PRIMARY HEALTH CENTRE AT KALIBAZAR -
Supply on hire basis panel board consisting of necessary main switch , change over switch, bus bar with necessary amp meter, volt meter complete including installation and dismantling the same after completion of the work as per direction of the EIC
Supply and fitting fixing salbollah on hire basis as per direction of EIC.
Erection of steel tubular pole of overall length 6 meter on hire basis by excavation of earth of any kind of soil 1.0/1.5 mtr. Depth below ground level with proper piling at different places with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 10.01.2025
Drawing of 150 watt LED street light fixture in different place of road,on hire basis from 10.01.2025 to15.01.2025 (6 days x 55 fittings per day)
Providing of hire basis drawing of 7/20 PVC insulated single core Aluminium cable for looping and all other requiredmet meterials & dismelting after the work.
Drawing of Tube Light at different points as per direction of EIC from 10-01-2025 to 16-01-2025 =7 days x 65 pts
Providing on hire basis earthing arrangement by earth electrode as per IE Rules and as per direction of EIC
Earthing the whole installation with 50 mm dia GI pipe as per IS for hire charges for temporary basis
Fitting fixing of departmentally supplied 5 nos fire extinguisher for safety the whole system including carrying charges from Ganga Sagar store to Rudranagar Hospital and back the same after completion of mela
Construction of 12 ft x 14 ft hogla shed by supplying bamboo, polythene sheet, hogla, nail etc as per direction of the EIC only for personnel [not for DG set]
Guarding arrangement of the whole installation round the clock from 10-01-2025 to 16-01-2025
B T PROJECTS PRIVATE LIMITED (BID ID -5717178)
ORIENTAL ENGINEERING CO. (BID ID -5703629)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .