Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹36.2 L+₹99,458.16 (2.83%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹36.9 L+₹1.7 L (4.96%)Admitted-Finance G II 3 ELDECO ESTATE ONE G T ROAD SECTOR 6 PANIPAT PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | L3 | Admitted-Finance |
Tender Value
₹35.5 L
EMD Value
₹71,042
Closing Date
6 Aug 2025, 3:00 pmClosed
EE/SD-2/DDA
EE/SD-2/DDA/SEED BED PARK SHAKARPUR DELHI
Construction of New Cement Concrete Practice Pitch(3no.), Black Clay Practice Cricket Pitch (3no.) and Relaying of Cement Concrete Practice Pitch (1 No.) and Providing safety net and grassing around Pitch at Yamuna Sports Complex (Specialized work).
2025_DDA_871493_1
11/EE/Sports Division - 2/DDA/2025-26 (Re-invited)
Open Tender
Civil Works
Percentage
60 days
EE/SD-2/DDA/SEED BED PARK SHAKARPUR DELHI
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹71,042
29 Aug 2025
1 Aug 2025
7 Aug 2025
1 Aug 2025
6 Aug 2025
1 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (a) Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 153 | cum | 2,434.25 | ₹3,72,440.25 |
| - | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: (a) All kinds of soil | 115 | sqm | 129.85 | ₹14,932.75 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge: All kinds of soil | 112 | cum | 177.5 | ₹19,880 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / in manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. | 26 | cum | 260.3 | ₹6,767.8 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 124 | cum | 196 | ₹24,304 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 23 | cum | 8,340.85 | ₹1,91,839.55 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-lll) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 12 | cum | 6,518.6 | ₹78,223.2 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 120 | sqm | 392.15 | ₹47,058 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
a) 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 16 | Cum | 8,583.4 | ₹1,37,334.4 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
A) Thermo-Mechanically Treated bars of grade Fe-500D or more | 819 | kg | 107.85 | ₹88,329.15 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
NIT.pdf
Tender Document • 2.39 MB
Tendernotice_1.pdf
Tender Document • 0.79 MB
BOQ_916134.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .