Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 LAccepted-AOC 16 1 13 GANAPATHY GOUNDER STREET KARUMALAIKOODAL METTUR SALEM 636 402 | METTUR | SALEM | TAMIL NADU | 636402 | L1 | Accepted-AOC Accepted |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
29 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/MEDC/Mettur
O/o SE/MEDC/Mettur
works for effecting services in various schemes in Vanavasi Section in Omalur division
2024_EB_408764_1
SE/MEDC/AEE/MM/MTR/Spec No.050/23-24
Open Tender
Electrical Works
Works
365 days
Mettur EDC
EMD and documents as per BQR condition
2 documents required · 2 mandatory
₹0
₹20,000
29 Jun 2024
11 Jan 2024
29 Jan 2024
11 Jan 2024
29 Jan 2024
11 Jan 2024
11 Jan 2024 - 29 Jan 2024
Amount
Work contract schedule
Excavation of pole pit upto 27'' (8.0m) Pole by using JCB or manual
Excavation of pole pit upto 30'' (9.0m) Pole by using JCB or manual
Excavation of stay pit 4.5' to 5' depth by using JCB or manual
Hard Rock requires blasting
Erection of PSC/RCC pole upto 8.0m (27") by using Crane
Erection of PSC/RCC pole upto 9.0m (30") by using Crane
Erection of Stay set complete
Fixing of HT V cross arms (all type) / channel cross arms/ guarding cross arm
Fixing of LT 3PH cross arm
Fixing of LT 1PH cross arm
Fixing of HT/LT TI Fitting
Fixing of HT Pin insulators 22KV
Fixing of HT Strain Disc 11KV and 22KV
Fixing of LT Pin Insulators
Fixing of LT Shackle
Fixing of LT Aluminium Knob
Paving and stringing of 7/4.09 mm ACSR
Paving and stringing of 7/3.35 mm ACSR, 7/3.30mm AAAC
Paving and stringing of 7/2.59 mm ACSR
Flat guarding including fixing of 2 nos cross arms
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
Earthing of pole with coil earthing including burying looping and binding
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Transport of Materials below 8 kms.
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading of poles upto 27"
Unloading of poles upto 27"
Loading of poles upto 30"
Unloading of poles upto 30"
Loading of line Materials
Unloading of line Materials
Loading or unloading of Transformer above 100 and upto 200 KVA
Erection of New Transformer all capacities (with jumpering)
Replacement of failed Transformer upto 200KVA
Aletration of Back clamp
Aletration of Stay clamp
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of channel
Dismantling of RCC pole 9.14mtr/RSJ pole
Dismantling of RCC pole 8mtr/7.5mtr pole
Dismantling of V X arm, Channel X arm. Guarding X arm
Dismantling of LT 3 ph X arm
Dismantling of LT 1 ph X arm
Dismantling of HT/LT TI fitting
Dismantling of 11KV strain disc
Dismantling of 22KV pin insulator
Dismantling of LT Shackle
Dismantling of LT pin insulator
Dismantling of Aluminium Knob
Dismantling of stay set
Dismantling of ACSR 7/3.35mm conductor
Dismantling of ACSR 7/2.59mm 7/2.11mm conductor
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Releasing of single phase service and re-fixing.
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .