| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance | ₹32.5 L | L1 | Admitted-Finance |
| 2 | L2₹32.7 LAdmitted-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹32.7 L | L2 | Admitted-Finance |
| 3 | L3₹33.5 LAdmitted-Finance | ₹33.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.K. ENTERPRISE L1 | F.R. ENTERPRISE L2 | K R ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Installation of 483 mtr. 1000mm width belt structures with belting along 64L in R-VII seam at 3&4 Incline, J.P.Colly. | ||||||
| 1.01 | Transportation of the 1000mm width structures and installation at 64L/12D to 64L/26D(R-VII Seam) along with all associated jobs for extension of belt conveyor in regular intervals(14 times)(excluding supply of materials). | 1 | WORK | 16,38,053 ₹16.4 L | 16,46,243.26 ₹16.5 L | 16,87,194.59 ₹16.9 L |
| 1.02 | Transportation of 966 mtr.(approx) 1000mm PVC belting through haulages & 100mtr. manually to 64L(R-VII) belt extension site. | 1 | WORK | 2,89,068 ₹2.9 L | 2,90,513.34 ₹2.9 L | 2,97,740.04 ₹3.0 L |
| 1.03 | Laying, Lapping, Jointing & Tensioning of this 966 mtr. 1000mm belting from 64L/12D to 64L/26D in R-VII seam during fourteen times belt extension and trial run. | 1 | WORK | 4,17,542 ₹4.2 L | 4,19,629.71 ₹4.2 L | 4,30,068.26 ₹4.3 L |
| 1.04 | Shifting and installation of tailend at the time of belt extension (64L/12D to 64L/26D) | 1 | WORK | 3,21,186 ₹3.2 L | 3,22,791.93 ₹3.2 L | 3,30,821.58 ₹3.3 L |
| 1.05 | Taking apart 1000mm width, structure, lockout arrangement ((0.1457*34.5*14=70.4) ton) and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7 | 1 | WORK | 96,358 ₹96,358 | 96,839.79 ₹96,839.79 | 99,248.74 ₹99,248.74 |
| 1.06 | Unlapping & pulling out of approximately 966 mtr. 1000mm width PVC belting of previously installed belt conveyors at panel 7 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage. | 1 | WORK | 4,49,662 ₹4.5 L | 4,51,910.31 ₹4.5 L | 4,63,151.86 ₹4.6 L |
| 1.07 | Supply of M.S. Nut & Bolt (5/8"x2") | 322 | KG | 125 ₹40,250 | 125.62 ₹40,451.25 | 128.75 ₹41,457.50 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | WORK | - | - | - |
Tender Value
₹38.4 L
EMD Value
₹48,000
Closing Date
19 Jan 2026, 11:00 amClosed
AREA ENGINEER ENM
Office of the General Manager, Jhanjra Area, ECL
Installation of 483 mtr. 1000mm width belt structures with belting along 64L in R-VII seam at 3n4 Incline, J.P.Colly
2026_ECL_350834_1
ECL/GM/JNR/EnM/A2/25-26/111 dated 03.01.2026
Open Tender
Miscellaneous Works
45 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹48,000
4 Feb 2026
7 Jan 2026
20 Jan 2026
7 Jan 2026
19 Jan 2026
8 Jan 2026
7 Jan 2026 - 14 Jan 2026
Installation of 483 mtr. 1000mm width belt structures with belting along 64L in R-VII seam at 3&4 Incline, J.P.Colly.
Transportation of the 1000mm width structures and installation at 64L/12D to 64L/26D(R-VII Seam) along with all associated jobs for extension of belt conveyor in regular intervals(14 times)(excluding supply of materials).
Transportation of 966 mtr.(approx) 1000mm PVC belting through haulages & 100mtr. manually to 64L(R-VII) belt extension site.
Laying, Lapping, Jointing & Tensioning of this 966 mtr. 1000mm belting from 64L/12D to 64L/26D in R-VII seam during fourteen times belt extension and trial run.
Shifting and installation of tailend at the time of belt extension (64L/12D to 64L/26D)
Taking apart 1000mm width, structure, lockout arrangement ((0.1457*34.5*14=70.4) ton) and transportation outside panel(by haulages and manually as required)(excluding supply of materials) of previously installed belt conveyors at panel 7
Unlapping & pulling out of approximately 966 mtr. 1000mm width PVC belting of previously installed belt conveyors at panel 7 and salvaging them from this panel in R-VII seam to (72L-71L)/4D in R-VII seam by the help of haulage.
Supply of M.S. Nut & Bolt (5/8"x2")
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_363581.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid