Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -41.16% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.4 LAdmitted-Finance | -31.50% | ₹3.4 L | L2 | Admitted-Finance |
| 3 | L3₹3.6 LAdmitted-Finance | -28.10% | ₹3.6 L | L3 | Admitted-Finance |
| 4 | L4₹3.7 LAdmitted-Finance | -26.60% | ₹3.7 L | L4 | Admitted-Finance |
| 5 | L5₹3.9 LAdmitted-Finance | -21.10% | ₹3.9 L | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
28 Mar 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_306598_1
e-NIT No.203 of 2025-26 Dated 23-03-2026
Open Tender
Civil Works
30 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹10,000
11 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
28 Mar 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 87.45 | Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 5.72 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 18.72 | Cum | - | - |
| 4 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-4 class (Heavy duty) R.C.C. pipes 900 mm dia. R.C.C. pipe | 7.5 | Rmt | 6,081.65 | ₹45,612.38 |
| 5 | Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters | 330 | Sqm | 153 | ₹50,490 |
| 6 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | 74.3 | Cum | 1,204.15 | ₹89,468.35 |
| 7 | Stone screening of size 13.2 mm nominal size (Type A) | 16.3 | Cum | 1,204.15 | ₹19,627.65 |
| 8 | Moorum | 5.9 | Cum | 668.95 | ₹3,946.81 |
| 9 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density. | 74.3 | Cum | 768.15 | ₹57,073.55 |
| 10 | Centring and Shuttering including strutting, propping etc and removal of form work for Foundations: footings, bases of columns etc. for mass concrete. | 124.8 | Sqm | 286.35 | ₹35,736.48 |
stage.html
html • 0.04 MB
techsummary_995435.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
BOQ_995435.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid