Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC FLAT NO 2 AMEYA APARTMENT SHIV COLONY NEAR PANDAV NAGARI INDIRA NAGAR NASHIK 422009 | NASHIK | NASHIK | MAHARASHTRA | 422009 | L1 | Accepted-AOC BeingL1 | |
| 2 | L2₹28.4 L+₹5.1 L (22.1%)Rejected-Finance | L2 | Rejected-Finance BEING NOT L1 | |
| 3 | L3₹28.9 L+₹5.6 L (24.2%)Rejected-Finance | L3 | Rejected-Finance BEING NOT L1 | |
| 4 | L4₹29.2 L+₹6.0 L (25.6%)Rejected-Finance | L4 | Rejected-Finance BEING NOT L1 | |
| 5 | L5₹31.8 L+₹8.6 L (37.1%)Rejected-Finance GALA NO B 128 129 130 SATYAM INDUSTRIAL ESTATE OFF KARVE ROAD OPP SNDT COLLEGE ERANNDWANE PUNE 411038 PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L5 | Rejected-Finance BEING NOT L1 |
Tender Value
₹37.7 L
EMD Value
₹75,400
Closing Date
16 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF OJHAR
GE AF OJHAR
COMPREHENSIVE MAINTENANCE OF AC PLANTS AT AIR FORCE STATION OJHAR
2022_MES_509146_1
8856/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
OJHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹75,400
Yes
22 Apr 2022
18 Feb 2022
18 Mar 2022
19 Feb 2022
16 Mar 2022
4 Mar 2022
60 days
Amount
Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 300 TR (2 x 150 TR Working + 1x 150 TR Stanby) at Bldg No. RSDL Old P-360 =01 No & 300 TR (2 x 150 TR Working + 1x 150 TR Stanby) at Bldg No. RSDL New P-284 = 01 No, Make-Voltas, comprising of following equipment, complete all as specified and directed by Engineer-in-Charge. inspection of machine, checking pressure, checking controls, checking control wiring including carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed a) Chillar unit Make-Voltas = 03 Sets (b)Compressor suitable for 2X150 TR ,415 V ,50 HZ, - 03 Sets c) Condensar Unit Make Voltas =03 Sets d) Chillar water pump set back pull out type monoblock -3 Nos. e) Condenser water pump set back pull out type monoblock -3 Nos. g) Cooling tower round shape induced draft type ,direct driven propelar fan motor , fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank -01No. h) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. j) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. k) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos. l) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set m) Chilled water/ Condenser/cooling tower MS/GI piping up to 150mm dia with valves pressure gauge temperature gauge complete-01Set (ii) Contractor shall carry periodical maintenance of above mentioned equipment by providing minor servicing like greasing of bearings, replacement of glands, MS Nuts & bolts, rubber , coupling, teflon tape, insulation tape & other minor spares including cleaning of AHU filters , further cost of minor repairing of valves & joints of pipe line is deemed to be included in quoted rate. Note for items no. 1 - Spares for items should be measured and paid under relevent srl items 5 to 11, 14 & 21 to 23 & 30 to 32.
Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working ) of Make : Voltas at Bldg No. RSDM P-52 comprising of following equipment complete all as specified and directed by Engineer-in-Charge. inspection of machine, checking pressure, checking controls, checking control wiring including carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed a) Chillar unit Make-Voltas = 02 Sets (b)Compressor suitable for 2X50 TR ,415 V ,50 HZ, - 03 Setsc) Condensar Unit Make Voltas =02 Setsd) Chillar water pump set back pull out type monoblock -3 Nos. e) Condenser water pump set back pull out type monoblock -3 Nos.g) Cooling tower round shape induced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank Make-Mihir -01No.h) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos.j) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No.k) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos.l) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Setm) Chilled water/ Condenser/cooling tower MS/GI piping up to 150mm dia with valves pressure gauge temperature gauge complete-01Set (ii) Contractor shall carry periodical maintenance of above mentioned equipment by providing minor servicing like greasing of bearings, replacement of glands, MS Nuts & bolts, rubber , coupling, teflon tape, insulation tape & other minor spares including cleaning of AHU filters , further cost of minor repairing of valves & joints of pipe line is deemed to be included in quoted rate. Note for items no. 2:- Spares for items should be measured and paid under relevent srl items 5 to 10,12, 14 & 18 to 20 & 27 to 29.
Comprehensive maintenance of Air Conditioning plant 3x 8.25 TR at Signal section Bldg No. P-64 of Make Voltas including chiller unit, condenser unit, .(02 Running+01 Standby),inspection of machine, checking pressure, checking controls, checking control wiring and rectification of all mentioned, carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed Note for items no. 3:- Spares for items should be measured and paid under relevent srl items 5 to 10,13, 14 & 15 to 17 & 24 to 26.
Comprehensive maintenance of central AC plant of Air cooled capacity 6 x 8.75 TR at ASD-23 Bldg No.P-51 of Make Voltas,Model no:-SC875DGR407 connected to AHU with 2 circuit of 03 nos of out door unit each, inspection of machine, checking pressure, checking controls, checking control wiring and rectification of all mentioned, carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed. Note for items no. 4 :- Spares for items should be measured and paid under relevent srl items 5 to 10, 14,33 Note for items no. 1 to 4: Mentioned Note is applicable for item no 1 to 4:- Quoted rate deemed to be include with cost of following : (a) Complete maintenance and Inspection by responsible qualified and trained staff in order to keep all the euipment inservisible condition to achieve desired parameter inside the air conditional space. (b) To carry out the periodical maitenace of AC plant if necessary for effective functioning. (c) The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound condition to aviod the accident and breakdown. (d) Routine checks necessary for satisfactory running the above plant and cooling tower complete all as diected by Engineer-in-charge. (e) Topping up of gas in case of leakage,compressor oil refill,descaling,repair to compressor, Condensor, motor,pump electrical panel,water supply valves,leakage,leaking refrigerant valves etc. (f) To attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant .The employee shall required to keep their own T&P to attend the fault/break down in quick succession also contractor require to provide PVC insulation tape roll /Teflon tape roll,rubber gasket & safety equipments etc. (g) Major Spares parts & Gas etc shall be measured &paid under respective item. Labour charges for fixing spares against Sl Item No. 34 to 45 & 51 to 57 paid under Item No.1 to 4
Supply only electronic auto sensor unit (PC card with all component). capacity complete all as directed.
Supply only High Pressure Cut Out sutable as per sample complete all as directed.
Supply only Low Pressure Cut Out sutable as per sample complete all as directed.
Supply only universal/Strainer filter cum dryier suitable for Chilled Water Plant as per site requirement complete all as directed.
Supply only old unservicable Pressure relief valve. 0 to 300 Psi Sutable as per sample complete all as directed.
Supply only catchall filters or any other for Liquid line, working pressure 500 PSI Suitable for R 407 C, R 134A, R 22 Gas including arragement for installation of filter if required
Supply only PVC frills (small size) in colums of size 60 x 30 x 15 cm or next higher size for 150 TR cooling Towers of 4 Nos as per existing specification and requirement complete all as directed.
Supply only PVC frills (small size) in colums of size 60 x 30 x 15 cm or next higher size for 100 TR cooling Towers of 1 Nos as per existing specification and requirement complete all as directed.
Supply only PVC frills (small size) in colums of size 60 x 30 x 15 cm or next higher size for 26 TR cooling Towers of 1 Nos as per existing specification and requirement complete all as directed.
Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for 100 TR, 300 TR, 26 TR Plants Capacity complete all as directed.
Supply only Bimetallic over load relays of capacities ML 0 / ML1 / ML 1.5 for 4-6.5 Amps Make-L&T Cat No SS 90035TO. (Supply only spares for AC plants during maintenance /repair of plants, as and when required throughout the contract period complete all as specified & as directed)
All as per itm no 15 here-in-before but 6-10 Amps Make-L&T Cat No 33 SS9185800VO or equivalent in Siemens/ ABB
All as per itm no 15 here-in-before but 10-16 Amps Make-L&T Cat No SS91858OOBO or equivalent in Siemens/ ABB
All as per itm no 15 here-in-before but 13-21 Amps Make-L&T Cat No 91859OOCO or equivalent in Siemens/ ABB
All as per itm no 15 here-in-before but 20-32 Amps Make-L&T Cat No 91859OOEO or equivalent in Siemens/ ABB
All as per itm no 15 here-in-before but 28-42 Amps Make-L&T Cat No 91859OOFO or equivalent in Siemens/ ABB
All as per itm no15 here-in-before but 66-110 Amps Make-L&T Cat No 94137OOKO or equivalent in Siemens/ ABB
All as per itm no 15 here-in-before but 20-33 Amps Make-Siemens Cat No SS9413600G0 or equivalent in Siemens/ ABB
Supply onlyTimer for star-delta starter ST-100 0-120 ST80328OOOO of L&T or equivalent in BCH/Siemens as approved.
Supply only Single phase preventor for electric motors SDz5,415 V as approved.
Supply only Contactor 3 phase AC 2 No,2NC for AC with coil voltage 240 Volts of following types (i) ML-1.5 Make-L&T Cat No SS91851or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for ML-2 Make-L&T Cat NoSS-90701 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for ML-3 Make-L&T Cat No SS90721 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for ML-4 Make-L&T Cat No SS90910 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for ML-6 Make L&T Cat No SS90921 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for MNX 22 1 NO ,1 NC cat No CS94980 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for MNX 22 1 NO,1 NC cat No CS94981 or equivalent in Siemens/ ABB
All as per item no 25 here-in-before but for 3TF34-0A 1 NO,1 NC coil Voltage 230 V Make siemens or equivalent in L & T/ ABB
Supply only Auxilary contact block for model No 3TF33 contactor NO/NC Make siemens or equivalent in L & T/ ABB
Supply only V belt of Make Fenner/Everest of size B/96 as approved.
All as per item no 34 here-in-before above but of size B-94
All as per item no 34 here-in-before but of size B-8
All as per item no 34 here-in-before but of size B-146
All as per item no 34 here-in-before but of size B-104
All as per item no 34 here-in-before but of size A-31
Supply only copper tubing 2 mm thick and 10 mm dia (3/8")for additional length required for in process of maintenance, complete all as specified & as directed.
All as per item no 40 here-in-before but of size 12 mm dia (1/2")
All as per item no 40 here-in-before but of size 6 mm dia (1/4")
All as per item no 40 here-in-before but of size 16 mm dia (5/8")
Supply only in repairs tempreture sensor complete wall/floor/roof mounted type complete all as per directed.
Supply only in repairs humidity sensor of diffuser unit wall/floor mounted type complete all as per directed.
M&L for leak repairing & gas charging of Central Type AC. Plant (Chilled Water Systems) 3X150 TR of 2 Nos a) Reapairs in refrigeration systems leak of any by "O" Ring and Gland Packing ,services Valves / Oil seal b) charging dry nitrogen & holding pressure for 24 hours. c) Vacuuming with double stage Vacume pump of (-) 2Kg/cm2 vaccum pressure d) Charging R 407c, R134A, R22 Including top up the Compressor Oil and charging the gas at varios Plant all as specified and directed by Eng- in- charge. Note:- (i) Cost of Nitrogen gas is deemed to be included in the quoted rate. (ii) Refregerant gas R407C, R134A, R22 & Compressor oil will be isued under separte items of this schedule. For Central Type AC. Plant (Chilled Water Systems) 3X150 TR of 2 Nos
All as per item no-46 but Central Type AC. Plant (Chilled Water Systems) 2X50 TR of 1 Nos
All as per item no-46 but Central Type AC. Plant (Chilled Water Systems) 3X8.25 TR of 1 Nos
All as per item no-46 but Central Type AC. Plant (Air cooled Systems) 4X8.75+2X8.75 TR of 1 Nos
Supply only Refrigerant (R-134a) tetrafluro ethane CH2FCF3, 62 Kg gas (enclosed in seamless steel cylinder having water volume of 68 litre capacity Note:The empty cylinder available with MES will be exchange) duly tested of Make:DUPONT-M complete all as specified and as directed by Engineer-in-Charge.
Supply only Refrigerant (R-22) monochoro difluro methane CHCLF2 , 61 Kgs gas(enclosed in seamless steel cylinder having water volume of 68 litre capacity,Note:The empty cylinder available with MES will be exchange) duly tested of Make:MAFRON-M complete all as specified and directed by Engineer-in-Charge.
Supply only Refrigerant 407C , 45 Kg gas of Make:DUPONT-M (enclosed in seamless steel cylinder having water volume of 68 litre capacity, Note:The empty cylinder available with MES will be exchange) duly tested of 45 Kgs capacity complete, all as specified and directed by Engineer-in-Charge.
Supply only VG 320 gear oil of Make : Servo Veedol /suitable for worm type gear box complete all as specified & directed
Supply only servo-68 compressor oil of approved make complete all as specified & directed
Supply only POE1605Z compressor oil of approved make complete all as specified & directed
Supply only D-huile compressor oil of approved make complete all as specified & directed
M&L for De-scaling the shell and tube type condensser of Central Type AC. Plant (Chilled Water Systems) 3X150 TR of 2 Nos by circulating de- scaling chemical through for 4/ 6 hours Opening the end cover of condenser and cleaning inner tube manually with the help of nylon / wire brush until complete scale to be removed and flush out with fresh water. Reassembling the end cover including replacment of gasket, nuts bolts ,washer etc., and testing complete all as directed by Eng.- in Charge.
All as per item no-57 but Central Type AC. Plant (Chilled Water Systems) AT Bldg. 2X50 TR of 2 Nos
All as per item no-57 but Central Type AC. Plant (Chilled Water Systems) AT Bldg. 3X8.75 TR of 1 Nos
All as per item no-57 but Central Type AC. Plant (Air cooled Systems) 4X8.25+2X8.25 TR of 1 Nos
M & L for Taking down electric motor of 0.5 HP to 1 HP of blower/pump from the existing position after diconnecting from foundation bolts & cable connections, de-coupling from blower/pump and transporting to the same to work shop for repairs, opening the electric motor, AC three phase, 400 / 415 volts 1500 / 2900 RPM, 50 Hz of any makes & model and re-winding with super enamelled copper winding wire of suitable gauge as per existing superior quality, insulating material after dismantling the motor separating starter, rotor, cleaning slots and stampings, replacement of both DE & NDE bearing with suitable Make bearing as mentioned, reassembling electic motor complete and packing suitable grade of lubricant, transporting motor back to the installation, fixing on the foundation, making proper allignment with blower, cleaning the body, frame and foundation with scraping the fallen paint rust etc. and painting one coat of synthetic enamel paint and writing MES No etc , complete all as specified & as directed.transporting the motor back to the installation and refixing in position on the frame or foundation, cleaning the body, scraping down fallen paint, rust, dust etc painting a two coats of synthetic enamel paint over one coat of primer after preparation of surface, connecting up water and electric connections and making good disturbed surfaces of insulation, piping and painting to match with the original surfaces including painting and marking MES No etc. for capacity, complete all as specified & as directed. (Note for item No 63 to 77: Complaint should be attended within 24 ours failing which a penalty of 200/ complaint/ Hour will be recovered from contractor.)
All as per itm no 61 here-in-before but for Electric motor above 1.0 HP to 2 HP
All as per itm no 61 here-in-before but for Electric motor 3HP
All as per itm no 61 here-in-before but for Electric motor 5 HP
All as per itm no 61 here-in-before but for Electric motor 7.5 HP
All as per itm no 61 here-in-before but for Electric motor 10 HP
All as per itm no 61 here-in-before but for Electric motor 15 HP
All as per itm no 61 here-in-before but for Electric motor 25 HP
All as per itm no 61 here-in-before but for Electric motor 60 HP
M & L for Taking down the monoblock electric driven pump set of capacity 2 HP of any make from the position after diconnecting the water and electric connections & foundation bolts and transporting to the work shop for repairs, opening the pump set, cleaning the internal parts and replacing shaft bearings, sleaves, shaft seal, key, brass bushes, gland, gland packing and both bearings (i .e DE & NDE) with sutable SKF make bearing complete, transporting the pump set back to the installation and refixing in position on the frame or foundation, cleaning the body, scraping down fallen paint, rust, dust etc painting a two coats of synthetic enamel paint over one coat of primer after preparation of surface, connecting up water and electric connections and making good disturbed surfaces of insulation, piping and painting to match with the original surfaces including painting and marking MES No etc. for capacity, complete all as specified & as directed.
All as per itm no 70 here-in-before but for Monoblock pump set 3 HP Electric motor
All as per itm no 70 here-in-before but for Monoblock pump set 5 HP Electric motor
All as per itm no 70 here-in-before but for Monoblock pump set 7.5 HP Electric motor
All as per itm no 70 here-in-before but for Monoblock pump set 10 HP Electric motor
All as per itm no 70 here-in-before but for Monoblock pump set 15 HP Electric motor
Material and labour for painting of Chilled water A/C Plant 3x 150 TR installation complete, cooling tower, AHUs, water main supply & return chilled water pipes including cleaning the plant/equipment preparation of surface, removing all dirt, scale deposits and painting with two coats of synthetic enamel paint including marking all machinery with machine numbers and distempering on chilled water mains with oil bound distemper as per existing colour coding complete all as specified & as directed.
All as per item no 76 here-in-before but for Chilled water plant (3X8.25TR)
All as per item no 76 here-in-before but for Chilled water plant (2x50TR)
All as per item no 76 here-in-before but for A/C Plant 4x8.75 TR + 2x8.75 TR at Signal Section
Suppy and fix in repair PVC insulated and FR PVC round sheathed, copper conductor (flexible) industrial cable,1100 volt, conforming to IS:694 of size 3 core and 10 sq mm with saddel inside flexible conduit complete all as specified and as directed.
Supply & Fix in repair Butterfly valve wafer type 100 mm PN-1.0/1.6 made up of SG iron, without Lugs, Lever operated, SG iron Disc, Nitrile /Rubber lining/Neoprene lining,Test pressure Art No 1078 of Make: Zoloto or Equivalent in kirloskar, complete all as specified and directede. Note : Rates quoted shall be deemed to include for cutting existing 100 mm MS pipe to accomodate butterfly valve, inserting suitable flanges, rubber gaskets, nuts bolts, making necessary welding work & testing the pipeline for trouble free operation complete all as directed.
Supply & installation of MVPD-EC Model - 80 to 440 amps with requisite control cabling enclosed inside flexible pipe complete all as specified & directed.
Supply & installation of CHW out temperature sensor with requisite control cabling enclosed inside flexible pipe complete all as specified & directed.
Supply & installation of VSPD2 -mini/eu,complete all as specified & directed.
Supply & installation of sub zero module SZT552-P, complete all as specified & directed.
Repairs to AHU complete by opening up the side covers taking out the insulation material by scraping out cleaning the entire portion removing all dust, chemical cleaning of cooling coils and treating internal side by applying two coats of black bituminous anticorrosive paint, Insulating again internal portion with 12mm thick thermocoal sheet pasted properly with adhesive and checking & setting control panels,interlocks & setting of panel, for AC Plant capacity from 20000 cfm to 32000 cfm (including welding works with welding material replacing old nut bolts etc) complete all as specified & directed. (a) Replacement of Blower bearing -02 Nos (b) Realignment/straightening of blower Shafts-02 job
Material and labour for air balancing of AHU of capacities 20000 cfm each, including arresting leakages at ducting and balacing air flow through various air diffuser located in various rooms of RSD(L) building complete all as specified & directed.
Dismantling existing false celing (sheet metal interlocking type)at new Rsd(L)buiding for carring out repair of AHU carring out repairs and refixing the same after carring out necessary repairs, complete all as specified and as directed.
Supply & installation ODU controller -MPD-TUA-01(7 to 20A) complete all as specified & directed.
Material & labour for general servicing / maint of cooling tower of 3X150TR plant at New RSDL, such as cleaning of tank inside, Makeup water tank, greasing of blower fan pulley, checking of fan belt tension etc complete all as directed by Engr-in-charge. (Note :- cleanings and general maintenance shall be carried out once in a month.
Material & labour for general servicing / maint of cooling tower of 2X50 TR Plant, such as cleaning of tank inside, Makeup water tank, greasing of blower fan pulley, checking of fan belt tension etc complete all as directed by Engr-in-charge. (Note :- cleanings and general maintenance shall be carried out once in a month.
Material & labour for general servicing / maint of cooling tower of 3X150TR plant at Old RSDL, such as cleaning of tank inside, Makeup water tank, greasing of blower fan pulley, checking of fan belt tension etc complete all as directed by Engr-in-charge. (Note :- cleanings and general maintenance shall be carried out once in a month.
Material & labour for general servicing / maint of cooling tower of 3X8.25 TR Plant signal section, such as cleaning of tank inside, Makeup water tank, greasing of blower fan pulley, checking of fan belt tension etc complete all as directed by Engr-in-charge. (Note :- cleanings and general maintenance shall be carried out once in a month. (Note For item No 93 to 96: Contractor shall submit Monthly general servicing report duly signed by the contractors rep, Concerned JE & Engr-in-charge. For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor.) Major items for repair shall be paid under relevant items of this schedule.
M& L in repairs of cast iron butterfly valve with maching double flanges ,gasket, necessary hardware complete all as specified and all as directed for 65mm bore
All as per item no-94 but 80mm bore
All as per item no-94 but 80mm bore 100mm bore
M & L in repair of Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed globe valve cast copper alloy to match with the existing 15 mm bore size including cutting welding/brazing required if any all as required at site.
All as per item no-97 but 25 mm bore
All as per item no-97 but40 mm bore
Supply only in repairs of thermal expansion valve suitable for 2X 50 TR Chilled water Central type AC plant system all as per sample, including brazing at both ends all as required and directed.
Supply only in repairs of thermal expansion valve suitable for 3X150 TR Chilled water Central type AC plant system all as per sample, including brazing at both ends all as required and directed.
Supply only in replacement of wet & dry bulb thermometer of A/C plant room.
Supply only in repairs single phase preventor in electric panel board of central type AC plants all as per direction of Eng-in-charge.
Supply only in repairs pilot solenoid valve assembly for central type AC plant as per sample complete all as directed.
Material & Labour for quarterly maintenance, and cleaning of the following including sprinkler nozzles blower, fins of filters etc in the suction blower room of AOS-23 painting shop, complete all as specified & as directed. (a) Exhaust Blower – 02 Nos (b) Exhaust Blower with water sprinkler system- 02 Nos. (c) Force in blower - 02 Nos (d) Pump Sets - 02 Nos (e) Spray Nozzles Assembly (01 Set of 64 Nozzles) - 02 sets (Note: Contractor shall submit Monthly general servicing report duly signed by the contractors rep, Concerned JE & Engr-in-charge. For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor.) Major items for repair shall be paid under relevant items of this schedule..)
Dismantling suction blower of Make: Patel Airtemp Pvt. Ltd, Model No CFPB100DIDW, from its existing position, dis-connecting the same from bearing and shaft by removing key, replacement of worn out shaft of length 1 meter dia 75 mm (collar dia 57 mm) of High alloy steel of grade EN-08, blowing out dust, chemical cleaning by spraying the organic based scale removing agent as approved at the appropriate ratio till the removal of complete dust and scale, greasing of blower, checking of electrical connection, replacement of unserviceable pedestal bearing-02 nos, renewel of rusted MS screw, applying 2 coats of synthetic enamel paint over a coat of primer, fixing the shaft with blower making proper balancing and alignment of blower with motor and testing blower for smooth running all as specified and directed.
Supply and fix DOL starter for 3 phase electric motor in steel sheet enclosure MK-I cat No SS96211 of L&T Make or equivalent in Siemens/ ABB
Material & Labour for removal of existing Unservicable damaged insulation from chilled water pipe 32 mm Dia. and - M&L for cleaning the pipe surface (to be insulated) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all Pipe joints are sealed against any leakage. replace with water pipe insulation half section PUF insulation shall bond to the surface of pipe with adhesive & binded with metal binding wire further insulation should be covered with fibre glass clothing and finally be finished with zylon base weather proof coating with two coats of AC ducting E 96 (Fevicol Make) as under: . Note:- (a) The adhesive shall be used for bonding the seams securely together including butt & logitudinal joints, fittings and coverings must be closed with adhesive. (b) The adhesive shall be specially formulated for the pipe insulation applicationand supplied by the insulatin manufacturer and have excellent bonding to porousand non porous surfaces.
All as per item no-108 but 40 mm Dia
All as per item no-108 but 50mm Dia
All as per item no-108 but 65mm Dia
All as per item no-108 but 80mm Dia
All as per item no-108 but 100mm dia.
All as per item no-108 but 125 mm Dia
Suplly and fix sprinkler assembly of cooling tower 150 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Suply and fix sprinkler assembly of cooling tower 100 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Suplly and fix sprinkler assembly of cooling tower 8.25 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Supply and fix tyre coupling to match with the existng to make coupling for the pump motor set, complete all as specified and as directed by the Engineer-in-charge.
Disconnecting the electrical and mechanical connection of burnt electrical motors of blower from the existing site / location, transporting to and return back from work shop. Rewinding of electrical motors by dismantling and removing the burnt copper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / roter after rewinding reassembling all parts including re-installing connection to original position and testing on full load all as directed by Engineer -in -charge for different capacity of motor as per following :- (i) 150x3 TR plant (ii) 50X2 TR plant (Note : Complaint should be attended within 24 ours & to be rectified within 72 Hours failing which a penalty of Rs 200/ complaint/ Hour will be recovered from contractor.)
OM SAI ASSOCIATES
BHAVIN INFRA
M/s Yash Trading Company
M/s Vijay Airconditioning Pvt Ltd
AIRFRAME
Shree Sai Samarth Enterprises
shakti engineering and electrical works
DIAMOND ENTERPRISES
BALAJI REFRIGERATION
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .