Loading…
Loading…
Tender Value
₹3.8 Cr
EMD Value
₹4.6 L
Closing Date
13 Oct 2026, 6:00 pm
Chief Engineer (P) Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Miz
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURF APPLYING TACK COAT WKS WITH BM 75 MM FOR RE-SURF WKS ON VARIOUS LOC KM 17.000 TO KM 35.200 KM NT LNGTH 4.35 KM ON D-V-F AND KM 0.000 TO 10.775 NT LNGTH 10.775 KM ON F-T RD 74 RCC 24 TF P
2026_BRO_790355_1
NIT15 OF 2026-27
Open Tender
Civil Works - Roads
Works
180 days
BET KM 17.00 TO KM 35.2 DVF RD KM 0 10.775 FT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹0
₹4.6 L
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl Miz
21 Sept 2026
21 Sept 2026
20 Oct 2026
22 Sept 2026
13 Oct 2026
28 Sept 2026
23 Sept 2026 - 26 Sept 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Re-Surfacing work on various locations between 17.000 TO KM 35.200 KM (NET LENGTH 4.35 KM) on Dungtlang-Vaphai-Farkawn Road | |||||
| 1.01 | Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work.
2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm. | 17,943.75 | Sqm | - | - |
| 2Re-Surfacing work on various locations between Km 0.00 to Km 10.775 (Net length 10.775 Km) on Farkawn-Thekte Road | |||||
| 2.02 | Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work.
2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm. | 44,446.88 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
tenddocsnit15dvfft.pdf
Tender Documents • 1.76 MB
BOQ_886014.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .