Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -0.31% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 CrAdmitted-Finance | -0.11% | ₹1.2 Cr | L2 | Admitted-Finance |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
21 May 2026, 12:00 pmClosed
SE RED Lucknow Circle
SE RED Lucknow Circle Near Vikas Bhawan, Sarvoday Nagar, Lucknow
Under District Lucknow, Construction of various lanes and roads near the house of Krishna Mohan Mishra located in Vishal Block-2 of Vidhan Sabha Lucknow Central., Lot No 51
2026_REDUP_1143808_51
25/SE RED Lucknow/Lucknow/26-27 Dt 02/04/2026
Open Tender
Civil Works
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹2.8 L
SE RED Lucknow Circle
4 Jun 2026
30 Apr 2026
22 May 2026
30 Apr 2026
21 May 2026
30 Apr 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Demolishing brick work manually /by mechanical means including stacking of servicceable material and disposal of unserviceable material with in 50 meter lead as per direction of Engineer- In - charge in cement mortar as per DAR No 15.7.4 | 12.42 | cum | 729.6 | ₹9,061.63 | |
Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 1.5m .as direced by Engineer -in-charge SI No. 2.6.1 | 778.83 | cum | 152.95 | ₹1,19,122.05 | |
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.DAR No.16.83 | 2,016 | sqm | 44.65 | ₹90,014.4 | |
Dismantling Reinforced cement concrete or Reinforced brick work including stacking of dismantled materials as directed by the Engineer - in - charge with in a distance of 60meters (200ft) as per S.I no 15.3 | 9 | cum | 1,261.6 | ₹11,354.4 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, all work upto plinth level 1:4:8 (1 cement : 4coarse sand :8 graded Stone aggregate 20mm nominal size) including supply of all materials, labour T&P etc. As per SI.No. PWD Sch. 4.1.8 | 36.34 | cum | 5,794.05 | ₹2,10,555.78 | |
Brick work with common brunt clay (non modular) brick of class-150 in foundation and plinth in Cement mortar 1:4 ( 1 cement: 4 coarse sand) As per DAR. 6.1.1 | 120.06 | cum | 6,379.25 | ₹7,65,892.76 | |
Providing and Laying in position Cement concrete of specified grade excluding cost of centering and shuttering - All work up to Plinth level: 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per S.O.R. 2020 (4.1.3) | 27.5 | cum | 6,640.5 | ₹1,82,613.75 | |
12mm cement plaster finished with a floating coat of neat cement of mix 1:4 (1 cement :4 fine sand) . As per SI. No. 13.7.2 | 631.8 | sqm | 187.15 | ₹1,18,241.37 | |
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Tachnical Specification Clause 401 | 495.6 | cum | 3,102.23 | ₹15,37,465.19 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.53 MB
Tendernotice_2.pdf
PDF • 5.20 MB
Tendernotice_3.pdf
PDF • 0.31 MB
BOQ_2136881.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid