Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.7 LAccepted-AOC | ₹30.7 L | 1 | Accepted-AOC lowest |
| 2 | 2₹34.4 LRejected-Finance 302 VISHAL NAGAR PH 2 BATHINDA | BATHINDA | BATHINDA | PUNJAB | ₹34.4 L | 2 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | YUKESH GOYAL CONTRACTOR L1 | SITA RAM CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | 1 | Cum | 103 ₹103 | 105 ₹105 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | 1 | Cum | 110 ₹110 | 110 ₹110 |
| 3.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 210 ₹210 | 205 ₹205 |
| 4.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020 | 1 | Cum | 81 ₹81 | 81 ₹81 |
| 5.00 | Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020 | 1 | Cum | 114 ₹114 | 114 ₹114 |
| 6.00 | Dressing of new earth work Item No.6.3(i) of CSR 2020 | 1 | Sqm | 1 ₹1 | 1 ₹1 |
| 7.00 | Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed. | 1 | Cum | 147 ₹147 | 147 ₹147 |
| 8.00 | Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii | 1 | Cum | 64 ₹64 | 64 ₹64 |
| 9.00 | Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a) | 1 | KM | 848 ₹848 | 848 ₹848 |
| 10.00 | Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020 | 1 | Sqm | 11 ₹11 | 11 ₹11 |
Updated dates
Tender Value
₹41 L
EMD Value
₹82,000
Closing Date
15 Dec 2025, 9:00 amClosed
DivisionalEngineerSangurBarnalaPWRMDC DivisionBarn
DivisionalEngineerSangurBarnalaPWRMDC DivisionBarnala
Estimate for ReLining Lining of WC by Laying Underground Pipeline of OL RD 12338TF of Minor No.12 of Sheron Disty Distt.Sangrur Laying and Jointing of RCC UGPL system and other allied works in construction of watercourse
2025_WR_153572_12
NIT10/2025
Open Tender
Civil Works
180 days
Sangrur
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹82,000
DivisionalEngineerSangurBarnalaPWRMDC DivisionBarn
12 Jan 2026
14 Nov 2025
15 Dec 2025
14 Nov 2025
15 Dec 2025
14 Nov 2025
19 Nov 2025
Amount
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr.
Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods Item No.6.2(a) of CSR 2020
Earth work undressed with combined lead upto 15mtr. including breaking of clods Item No.6.2(b) of CSR 2020
Dressing of new earth work Item No.6.3(i) of CSR 2020
Earthwork Filling in 0.152 mtr. layers in foundation, including ramming, watering and consolidation under bed.
Re-handling of earthwork recently executed item No.6.2(a) of CSR 2020 note No.ii
Dag belling single kassi stroke minimum 7.5 cm depth item No.6.18(a)
Dressing of bed and preparation of sub-grade for lining.Item No.19.1 of CSR 2020
First class burnt brick laid in cement sand mortar 1:6 for bed and side wall [Item No 11.3(i)].
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
10mm thick cement plaster 1:4 on bed and top.
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement (CSR Item No 10.13 (a) (i)
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
Cement concrete 1:4:8 with brick ballast 40mm gauge
Fixing of frame ( Non scheduled item)
Supplying & Laying Dry Brick Bats. item No.10.29
Lowering, jointing and cutting of RCC pipes 500 mm dia into trenches & laying same to correct alignment complete
Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No)
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4)
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 )
Providing and fixing of Alfa Alfa Valve fitted on riser pipe to act as Nakka (D regulators) DIA-500 mm
Centreing & shuttering for Concerte faces
Providing and fixing of Steel Shutter Gates Assembly in Main Pipeline complete in all respects.
Dismantling of Brick work in Cement, CSR 2020 - item no- 8.5 (b)
Miscellaneous item 1
Miscellaneous item 2
Miscellaneous item 3
SITA RAM CONTRACTOR (BID ID -703707)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 0.05 MB
PKG12RD12338TF.xls
Tender Documents • 0.05 MB
BOQ_311278.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid