Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.1 LAdmitted-Finance | +14.90% | ₹17.1 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 L+₹8,927.28 (0.52%)Admitted-Finance | +15.50% | ₹17.2 L+₹8,927.28 (0.52%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical WZ 400 PALAM VILLAGE DELHI WEST DELHI SOUTH WEST DELHI DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | - | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
Tender Value
₹19.5 L
EMD Value
₹39,100
Closing Date
11 Aug 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Deployment of Staff for Operation, Supervision for disposal of sewage at Loknayakpuram, Bakkarwala SPS (Newly taken from DDA) in AC-31.(Re-Invited)
2026_DJB_296495_2
NIT No. 8 (2026-27)EE(EnM)M-9
Open Tender
Civil Works
Works
180 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
DJB Account No. 50448339804
₹39,100
21 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Deployment of operational staff for Operation, Supervision, Watch & Ward of various B.P.Stns under Tilak-Nagar Constituency AC-29 . | - | - | - | - |
| 2.01 | Comprehensive Operation, Watch & ward, routine maintenance, and Disposal of sewage form Lokanayak, Bakkarwala SPS ( newly taken from DDA) as per the approved schedule, under the supervision of the Engineer-in-Charge.
The work includes operation of pump sets (100 HP × 2 Nos., 75HP x 2 nos. and 40 HP × 2 Nos.), HT/LT electrical control panels, valves, dewatering pumps, and all associated electrical and mechanical equipment to ensure uninterrupted and efficient sewage disposal as per site requiremnt to maintain a low level in the sump well and prevent overflow in the concern area. | 180 | Days | - | - |
| 3.01 | Scope of Work:
• Operation and monitoring of electrical control panels, valves, Pumps & Motors and associated E&M equipment.
• Cleaning/removal of kachra (debris) from Valves, suction lines and pump sets to ensure smooth functioning.
• Maintaining daily log sheets and recording operational data and abnormalities.
• General cleaning of the pumping station area.
• Minor maintenance of electrical and mechanical equipment.
Note: Spares and materials required for minor maintenance/replacements shall be provided by the department.
Manpower Deployment:
• Operators (Skilled) – 3 Nos. (One per shift)
• Beldar/Helpers (Un-Skilled) – 8 Nos. (3 Nos. in two shift and 2 nos. in one shift) Total Period :-180 Days | 180 | Days | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_394697.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .