| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.1 LAccepted-AOC | 1 | Accepted-AOC accept | |
| 2 | 2₹2.1 L+₹1,112.50 (0.53%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | SON VIR L1 | M/S RINKU CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 2,738 | Sqm | 4.4 ₹12,047.2 Lowest | 4.4 ₹12,047.2 Lowest |
| 2.00 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 1,310 | Cum. | 63 ₹82,530 Lowest | 63 ₹82,530 Lowest |
| 3.00 | Earth Work in silt clearance including Lead upto 200 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 445 | Cum. | 152 ₹67,640 Lowest | 154.5 ₹68,752.5 |
| 4.00 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 8,118 | Sqm | 4.5 ₹36,531 Lowest | 4.5 ₹36,531 Lowest |
| 5.00 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 8 | Nos. | 330 ₹2,640 Lowest | 330 ₹2,640 Lowest |
| 6.00 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 1 | Cum. | 5,542 ₹5,542 Lowest | 5,542 ₹5,542 Lowest |
| 7.00 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour, T&P etc complete as directed by Engineer in charge. | 17 | Sqm. | 57 ₹969 Lowest | 57 ₹969 Lowest |
| 8.00 | Printing letters including all cost of material, labour and T&P etc. up to 10 cm ht | 20 | Nos | 14 ₹280 Lowest | 14 ₹280 Lowest |
| 9.00 | Painting Gauge including all cost of material, labour and T&P etc. up to 25 cm. width .including all labour, T&P etc complete as directed by Engineer in charge. | 5 | RM. | 50 ₹250 Lowest | 50 ₹250 Lowest |
| 10.00 | 12 mm thick cement plaster in 1:4 cement & course sand on brick masonary including all labour, T&P etc complete as directed by Engineer in charge. | 1 | Sqm. | 196 ₹196 Lowest | 196 ₹196 Lowest |
Tender Value
₹2.1 L
EMD Value
₹5,000
Closing Date
28 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
UMBDGC KHURJA
SILT CLEARENCE OF MINORS
2026_UPIDC_1187133_10
06/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹5,000
18 Oct 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing thick bushes and thorny jungle without uprooting i/c cost of all material,labour,T&P etc | 2,738 | Sqm | - | - |
| 2 | Earth Work in silt clearance including Lead upto 30 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 1,310 | Cum. | - | - |
| 3 | Earth Work in silt clearance including Lead upto 200 M and Lift upto 1.5 M including ramming and dressing by Manual Labour. The Earth from clearance to be used in side embankment or to be disposed off at spoil banks including all labour ,T&P etc complete as directed by Engineer-in-charge. | 445 | Cum. | - | - |
| 4 | Scrapping Internal Section of existing channel in Side Slope with silt upto 5cm including all labour, T&P etc complete as directed by Engineer in charge. | 8,118 | Sqm | - | - |
| 5 | V.R.B or bridge clearance including all labour,T&P etc complete all as directed by Engineer in charge. | 8 | Nos. | - | - |
| 6 | 1st class brickwork in superstructure in 1:4 Cement mortar using coarse sand i/c cost of all material,labour,T&P etc | 1 | Cum. | - | - |
| 7 | Finishing of walls with water proofing cement paint of approved make such as super Snowcem, Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour, T&P etc complete as directed by Engineer in charge. | 17 | Sqm. | - | - |
| 8 | Printing letters including all cost of material, labour and T&P etc. up to 10 cm ht | 20 | Nos | - | - |
| 9 | Painting Gauge including all cost of material, labour and T&P etc. up to 25 cm. width .including all labour, T&P etc complete as directed by Engineer in charge. | 5 | RM. | - | - |
| 10 | 12 mm thick cement plaster in 1:4 cement & course sand on brick masonary including all labour, T&P etc complete as directed by Engineer in charge. | 1 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_2234999.xls
BOQ • 0.25 MB
00002.pdf
PDF • 0.24 MB
CORRIGENDUM06.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .