Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 CrAccepted-AOC | ₹4.5 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹4.8 Cr+₹24.6 L (5.45%)Rejected-Finance COIMBATORE | TIRUPPUR | TAMIL NADU | 638459 | ₹4.8 Cr+₹24.6 L (5.45%) | L2 | Rejected-Finance Highest Rate Quoted |
| 3 | L3₹4.8 Cr+₹26.9 L (5.94%)Rejected-Finance 20A 630302 | SIVAGANGA | TAMIL NADU | 630302 | ₹4.8 Cr+₹26.9 L (5.94%) | L3 | Rejected-Finance Highest Rate Quoted |
Tender Value
₹4.5 Cr
EMD Value
₹2.3 L
Closing Date
23 Feb 2026, 10:00 amClosed
Superintending Engineer Coimbatore
Superintending Engineer Office Highways Department Construction and Maintenance Highways compound Trichy road Coimbatore 641018
Strengthening Improvements Retaining wall CD Works CC Drain and Protective works on Government roads in Udhaga mandalam H C and M Sub Division and Kotagiri H C and M Sub Division CBE 094
2026_HWAY_654944_1
094 - 2026-27 - 1
Open Tender
Civil Works - Highways
Percentage
122 days
Udhagamandalam
Refer pre qualification document volume I
15 documents required · 15 mandatory
₹0
₹2.3 L
2 Mar 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
23 Feb 2026
14 Feb 2026
13 Feb 2026 - 13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 (Morth No. 111, 112, 501, 503, 900) | 1 | Square metre | - | - |
| 2 | Road A | 6,614.53 | Square metre | 35.76 | ₹2,36,535.59 |
| 3 | Road B | 2,813 | Square metre | 35.76 | ₹1,00,592.88 |
| 4 | Road C | 8,790.25 | Square metre | 35.77 | ₹3,14,427.24 |
| 5 | Road D | 20,060.65 | Square metre | 35.76 | ₹7,17,368.84 |
| 6 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)
(Morth No. 111, 112, 501, 504, 900, 3004) | 1 | Square metre | - | - |
| 7 | Road A | 27.04 | Cubic metre | 11,430.67 | ₹3,09,085.32 |
| 8 | Road B | 13.96 | Cubic metre | 11,537.96 | ₹1,61,069.92 |
| 9 | Road C | 42.84 | Cubic metre | 11,599.32 | ₹4,96,914.87 |
| 10 | Road D | 96.29 | Cubic metre | 10,888.16 | ₹10,48,420.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
094Pricebid.pdf
Tender Documents • 0.50 MB
BOQ_785272.xls
BOQ • 0.46 MB
094PQDocument.pdf
Tender Documents • 0.46 MB
094.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .